Similar Projects
Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Bidding
Lexington, KY

Elsmere School HVAC and Generator
Alteration
Bidding
$300,000 est. value
Erlanger, KY

Replacement of Power Feed to IIU VOR in Louisville, KY
Post-Bid
Louisville, KY 40291

Overhead to Underground Distribution Improvements
Renovation
Post-Bid
Henderson, KY 42420

Switchgear Replacement at Jeffersontown High School
Results
Jeffersontown, KY 40299

Dosker B Building Electrical Upgrades
Results
Louisville, KY

Substation Capacitors
Alteration
Bidding
Owensboro, KY

Diesel Generator and ATS for the Gathering Place
Post-Bid
Henderson, KY 42420

Standby & Emergency Electrical Services
Results
Less than $50,000 est. value
KY

District 9 Lighting Maintenance
Alteration
Bidding
Flemingsburg, KY

Diesel Generator and ATS for the JFK Community Center
Post-Bid
Henderson, KY

Site Lighting Replacement at Conway Middle School
Results
Louisville, KY 40258

New Generator McCracken County Extension Office
Alteration
Bidding
$50,000 est. value
Paducah, KY 42001

Boone County Schools - LED Upgrades
Post-Bid
KY

UK PAV A Central Sterile Sink
Addition
Results
$55,000 est. value
Lexington, KY

Reported 06/01/2022 12:00 AM
Project Title

Oakwood Replace/Upgrade and Enhance Generators

Physical Address View project details and contacts
City, State (County) Somerset, KY 42501   (Pulaski County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $1,899,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes providing a standby rated generator system to support the entire electrical distribution system of the Oakwood campus. Also, to satisfy life safety code requirements, emergency battery back-up lighting fixtures will be added to facilities that currently do not have them. The standby generator system will consist of three 500KW natural gas fired generators, a transformer, and automatic transfer switch (ATS) connected in line with the main electrical service entrance. The generator plant will be located outside on concrete pads adjacent to Building 600. Existing generators that are located throughout the campus in individual buildings shall be disconnected and abandoned for future demolition. Generators at buildings 501 and 600 shall remain and the associated automatic transfer switches will be modified to become manual transfer switches. Also, the existing "load shed" control of one chiller at building 501 will be removed such that both will operate during an outage. The generator system shall be capable of producing 1,500KW (1,875 KVA) - 2,255A at 480V, 3-phase. The new generator plant area and equipment will be designed to accommodate future additions of generators to increase capacity if needed.

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents