Similar Projects
Spencer Wastewater Treatment Plant Upgrade Project - General Bids
Renovation
Bidding
$31,500,000 est. value
Spencer, MA 01562

Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - General Bid
Renovation
Bidding
$4,000,000 est. value
Acton, MA

Middle Fort Pond Brook WWTF Rehabilitation - Sub Bid
Renovation
Sub-Bidding
$4,000,000 est. value
Acton, MA

Wastewater Pre-treatment System Services
New Construction
Sub-Bidding
Lexington, MA

Capital Improvements and Long Term O and M
Post-Bid
Lynn, MA

Owner`s Project Manager Services for Martha's Vineyard Airport Waste Water Treatment Facility Upgrades
Post-Bid
West Tisbury, MA

Wastewater Treatment Facility Upgrades - Filed Sub-Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Wastewater Treatment Facility Upgrades - General Bids
Results
Less than $12,975,000 est. value
Orange, MA 01364

Downtown Area Wastewater Treatment Facility (WWTF) and Effluent Disposal - General Bid
Construction
$22,000,000 est. value
Orleans, MA 02653

Replacement of Primary Clarifier Drive 2 at the Southbridge Wastewater Treatment Plant (WWTP)
Renovation
Bidding
$75,000 est. value
Southbridge, MA 01550

Prison Point CSO Facility Improvements - Filed Sub-Bids
Post-Bid
Less than $42,500,000 est. value
Boston, MA

WWTF - Septage Receiving Upgrade
Results
Less than $1,250,000 est. value
Scituate, MA 02066

Attleboro Wastewater Treatment Facility Biofilter Rehabilitation
Renovation
Bidding
$460,000 est. value
Attleboro, MA

MCI Norfolk - Wastewater Plant Replacement - Filed Sub Bids
Renovation
Post-Bid
$9,905,000 est. value
Norfolk, MA

Removal and Replacement of Primary Clarifier Grout Coating
Results
Less than $100,000 est. value
North Attleborough, MA

Last Updated 06/07/2022 08:03 AM
Project Title

Wastewater Treatment Facility Upgrades Phase I Project - General Bid

Physical Address View project details and contacts
City, State (County) Bridgewater, MA 02324   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $33,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate Required. Work Included: Construction of the Wastewater Treatment Facility Upgrades - Phase I. The major proposed work under this contract includes but is not limited to: 1. Civil site work including land clearing, erosion and sedimentation controls, earthwork, ledge removal, installation of support of excavation, drainage, sewerage. hydrocarbon piping, water, site process piping, site utilities, site lighting, pavement, pavement striping, gravel drives, hot mix asphalt pavement, and utility structures. 2. Site demolition including pavement, piping, existing Repair Shop and ferric chloride storage tank and containment area, site lighting, underground structures and utilities, concrete tankage and pads; 3. Removal and disposal of three below grade fuel oil underground storage tanks (USTs) and one above ground oil storage tank. 4. Rehabilitation of existing site including pavement, grading and drainage improvements, site piping and utilities, loam and seeding; 5. Coordination with natural gas utility for the installation of a gas main with appurtenances. Gas company will install gas main along Morris Ave from Plymouth St to gas service connection shown on plans. Provide gas connections to the existing Degritting, Dewatering, Administration Buildings for building heat and gas fuel supply to a new standby generator as indicated on the drawings and as specified. 6. Removal and replacement of the existing primary and secondary sludge clarifier mechanisms including walkways, railings, and gratings. Preparation of concrete surfaces for a protective coating including cleaning and debris removal, concrete repairs and installation of protective coatings shall be as indicated on the drawings and as specified. 7. Improvements to the existing RBC process including cleaning and debris removal, structural repairs and modifications to the existing tankage, replacement of existing grating, gates, handrails, RBC covers and drives; installation of new RBC's, modifications to channels, new electrical connections, and instrumentation as indicated on the drawings; 8. Maintaining wastewater flows and treatment facility operations during construction. 9. Protection of existing structures, utilities and facilities to remain.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents