Similar Projects
Installation of two New Drinking Water Wells
Results
Less than $700,000 est. value
Plainville, MA

Emergency Repair of Submersible Motor at Well 6
Post-Bid
Foxborough, MA 02035

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Oak Street Replacement Wells 7R, 9R, and 10R
Results
Less than $815,000 est. value
Foxborough, MA 02035

Backwash Pump VFD Project
Post-Bid
Walpole, MA 02081

Wells 3 and 4 Water Treatment Plant - Filed Sub Bids
Renovation
Results
$8,400,000 est. value
Medfield, MA 02052

Municipal Drinking Water Well Cleaning and Rehabilitation
Term Contract
Post-Bid
Less than $200,000 est. value
Canton, MA

Cleaning and Redevelopment of the Town's Seven Wells
Term Contract
Results
Stoughton, MA 02072

Public Water Drinking Well Installation
Results
Plainville, MA

Well #3A Submersible Motor Replacement
Results
Less than $18,000 est. value
Needham, MA

Drinking Water Supply Well Rehabilitation
Results
$45,000 est. value
Bellingham, MA

Well 3A Submersible Pump and Motor Replacement
Post-Bid
Less than $25,000 est. value
Needham, MA

Peirce and Mann Halls Fire Pump, MSCBA Project - General Bids
Results
$125,000 est. value
Boston, MA

Wet Well Cleaning
Term Contract
Results
Stoughton, MA

Cleaning, Redevelopment and Chemical Treatment of Gravel Packed Wells
Post-Bid
Less than $82,000 est. value
Walpole, MA

Last Updated 05/04/2021 12:05 PM
Project Title

Wells 3 and 4 Water Treatment Plant - General Bids

Physical Address View project details and contacts
City, State (County) Medfield, MA 02052   (Norfolk County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Work under this Contract includes, but is not necessarily limited to, the construction of the Wells 3 & 4 Water Treatment Plant and modifications to Well Stations 3 and 4. The Wells 3 & 4 WTP will include: a pre-fabricated metal building system; chemical storage tanks and chemical feed systems; an iron and manganese filtration system; air scour blower, and associated structural, architectural, process piping, instrumentation and controls, plumbing, HVAC, and electrical work to provide a fully functional water treatment plant as specified in the Contract Documents. Modifications to Well Station 3 include demolition of the existing vertical turbine pump, abandonment of well 3, and the installation of a new submersible well pump 3A. Modifications to Well Stations 3 and 4 include selective demolition of chemical feed systems; instrumentation and controls; and replacement of process mechanical equipment, piping, and appurtenances. Additional work includes miscellaneous site work, yard piping, and appurtenances

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents