Similar Projects
Last Updated | 06/14/2022 05:28 AM |
Project Title | North Elm Street - Drainage Improvements 2022 |
Physical Address | View project details and contacts |
City, State (County) | McPherson, KS 67460 (McPherson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is briefly described as: Contractor Construction Staking 1 LS Mobilization 1 LS Removal of Existing Pipe and Structures 1 LS Stormwater Pipe (24")(RCP)(Installation Only) 1112 Lin Ft Stormwater Pipe (3.3s.f.)(RCPHE)(Installation Only) 87 Lin Ft Stormwater Inlet (Type 22)(Hauling & Installation Only) 9 Each Connect to Existing Storm System 2 Each Trench and Flowable Fill 310 Lin Ft Trench and Native Backfill (0-8") 892 Lin Ft Traffic Control 1 LS |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |