Similar Projects
FM 115 Inflow and Infiltration Reduction - City of Republic
Infrastructure
Conception
$1,440,500 est. value
Republic, MO

Woodland Park Linear Improvements - City of Republic
Infrastructure
Conception
$1,500,000 est. value
Republic, MO 65738

General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

Delaware Stormwater Improvements
Infrastructure
Bidding
$300,000 est. value
Springfield, MO 65803

7th and Canterbury Lane Stormwater Improvements
Infrastructure
Bidding
$220,000 est. value
Joplin, MO 64801

Union Road 100 Block Storm Improvements
Post-Bid
Saint Louis, MO 63114

2021 Emergency Repairs and On-Call Sewer
Term Contract
Post-Bid
Joplin, MO

Stanwood Dr and Belwood Dr Storm Sewer & Bank Stabilization
Results
$351,000 est. value
Normandy, MO 63121

Euclid 4130 and 4136 Bioretention CSO VR GI
Results
$250,000 est. value
Saint Louis, MO

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

Stormwater Update
Alteration
Pending Verification
Jefferson City, MO 65109

FM 109 inflow and Infiltration Reduction - City of Republic
Infrastructure
Conception
$1,323,000 est. value
Republic, MO

Great Rivers Greenway Connector Project Part A
Infrastructure
Post-Bid
$3,000,000 est. value
Brentwood, MO 63144

Minnie Ave to Greenhaven Storm Sewer Separation
Results
$183,000 est. value
Flordell Hills, Jennings, MO

Installation Of A Commercial Septic & Drain Filed System
Alteration
Post-Bid
Union, MO

Last Updated 07/06/2022 08:38 AM
Project Title

Medical Science Building Courtyard Storm Water Drainage and Landscape

Physical Address View project details and contacts
City, State (County) Columbia, MO 65201   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $153,698 to $170,775
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improve the storm water drainage and Landscape Design within the footprint of the courtyard. Extend Storm sewer system and water proof the foundation wall as needed. SCOPE OF WORK a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (1) Project consists of installing an new underground detention system and removal of existing landscaping and sidewalks necessary to install the work. The work also consists of restoring the grade, installing new sidewalks and restoring the area in preparation for new landscaping.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents