Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

System Preservation (Engineering)
Infrastructure
Bidding
$9,498,000 est. value
AZ

System Preservation (Restoration/Rehab/Resurface)
Infrastructure
Bidding
$9,498,000 est. value
Tucson, AZ 85757

High Water Crossing at Vamori Wash
Post-Bid
$10,000,000 to $20,000,000 est. value
Tucson, AZ 85746

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Pavement Rehabilitation
Results
Less than $21,640,000 est. value
AZ

Avra Valley Pavement Reconstruction Project - Phase 2
Results
Less than $2,000,000 est. value
Marana, AZ

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

Pavement Reconstruction Package 2022
Infrastructure
Bidding
Marana, AZ 85658

Groundhog Vista Landowners Roadwork
Post-Bid
Tucson, AZ 85743

AZ Flap 62(1), King Canyon Trailhead
Results
$250,000 to $700,000 est. value
Tucson, AZ 85743

Gladden Farms Birchfield Drive and Mikeetter Boulevard (East)
Infrastructure
Post-Bid
Marana, AZ

Skyline Drive at Sunrise Drive Intersection Improvements
Results
Less than $408,966 est. value
Tucson, AZ

Asphalt Repair and Re-Pavement Materials and Services
Term Contract
Post-Bid
Buckeye, Douglas, Florence, Globe, Goodyear, Phoenix, Safford, Saint Johns, Somerton, Tucson, Winslow, AZ 85607

Sandario Road: Ajo Highway to Emigh Road
Results
Less than $4,582,000 est. value
Tucson, AZ 85701

Last Updated 01/31/2022 04:25 AM
Project Title

System Preservation (Engineering)

Physical Address View project details and contacts
City, State (County) AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a bonded wearing course overlay. The project also includes spot repair work by milling and replacement with asphaltic concrete. Additional work includes replacing pavement markings and other miscellaneous work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents