Similar Projects
McKinney Boyd STEM, CTE & Fine Arts Expansion
Addition
Conception
$8,000,000 est. value
McKinney, TX 75071

Scott Johnson Middle School Fine Arts Expansion
Addition - 1,500 SF
Conception
$23,000,000 est. value
McKinney, TX 75071

Guest House on Garrett / 521 Bryan
New Construction, Infrastructure - 39,870 SF
Design
$3,283,000 CJ est. value
Dallas, TX 75201

Madinah Masjid School
New Construction - 43,984 SF
Design
$11,000,000 est. value
Carrollton, TX

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Post-Bid
$460,000 CJ est. value
Dallas, TX 75252

Wraparound Services Center
New Construction, Infrastructure - 11,000 SF
Post-Bid
$460,000 CJ est. value
Dallas, TX 75252

Excavation Improvements for Inspiration, Phase 8B
Alteration
Results
TX

Hardscape Improvements for Light Farms Brenham 2, Graham 2, Hazel 4, Cypress 3, Sweetwater 2
Infrastructure
Results
TX

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Construction
$95,000,000 CJ est. value
McKinney, TX 75069

Popeyes / McKinney
New Construction, Infrastructure - 2,700 SF
Construction
$725,000 CJ est. value
McKinney, TX 75070

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

Starbucks - Renner & PGBT
New Construction, Infrastructure - 2,063 SF
Pending Verification
$735,140 CJ est. value
Plano, TX 75074

New Middle School #6
New Construction
Conception
Prosper, TX

OT Tennis Academy
New Construction - 169,000 SF
Design
$4,000,000 est. value
Frisco, TX

Fuel City Travel Center / Wylie
New Construction, Infrastructure - 9,244 SF
Post-Bid
$4,400,000 CJ est. value
Wylie, TX 75098

Last Updated 04/10/2023 06:03 PM
Project Title

Prosper ISD High School #4 - Bid Package #1 - Buildings

Physical Address View project details and contacts
City, State (County) Prosper, TX 75078   (Collin County)
Category(s) Education, Entertainment/Recreation, Green Building, Heavy and Highway
Sub-Category(s) Athletic Facility, LEED Certified, Middle/Senior High School, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $150,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new 573,000 square foot, two-story high school building and a new 76,000 square foot multi-purpose building & multiple sports related out-buildings. IMPORTANT NOTES Structuaral Foundation Drawings will be issued in an Addendum. PISD is open to voluntary VE options for this project. In the course of preparing your proposal, please list any voluntary VE items that are applicable to your scope of work The Concrete Scope will be Bid in multiple Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.) 03A- Concrete (High School Bldg & Outbuildings) will include the High School Building, Courtyards, Mechanical Yards, Steps, Ramps, Planters, Screen Walls, Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts. Refer to the Bid Packages that will be issued no later than February 21st for additional information. 03B- Concrete (Sitework, Flatwork, and Paving) will include the all site related concrete flatwork and paving. This scope of work will be issued in the Site Package set of documents, currently projected to be bid out on 4/25/2023. The Masonry Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.) 04A- Masonry (High School Bldg & Appurtenances) will include the High School Building, Courtyards, Mechanical Yards, Steps, Ramps, Planters, Screen Walls. Refer to the Bid Packages that will be issued no later than February 21st for additional information. 04B- Masonry (Outbuildings & Site) will include the Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts. Refer to the Bid Packages for additional information. The Roofing Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.) 07C- Roofing and Sheetmetal (High School Bldg & Appurtenances) will include the High School Building, Courtyards, Mechanical Yards, Planters, Screen Walls. Refer to the Bid Packages that will be issued no later than February 21st for additional information. 07D- Roofing and Sheetmetal (Outbuildings & Site) will include the Multi-Purpose Bldg, Concessions Bldgs, Ticket Bldgs, Pump House Bldg, Batting Cage Bldgs, Dugouts. Refer to the Bid Packages for additional information. The Electrical Scope will be Bid in two sperate Bid Packages and should be bid as either or (Please provide a Voluntary Alternate is any cost savings for being awarded both packages.) 26A- Electrical (High School) 26b- Electrical (Multi-Purpose Bldg) will include all electrical work within the MPF building footprint. We will require accounting breakouts for the following: (we need to check these page references and scope) Site Work High School Building, Area A thru S per A1.01 & A1.02 Multi-Purpose Facility, Area T, U & V per A1.03 Concessions, Football Area W per A1.25 Concessions, Baseball Area X per A1.25 Batting Cage, Baseball Area Y per A1.25 Ticketing, Area Z per A1.25 Ticketing, Area AA per A1.25 Ticketing, Area BB per A1.25 Batting Cage, Softball Area CC per A1.25 Pump Room Area DD per A1.25 Direct all bids/inquiries to the general contractor. Addendum #1-#2 have been issued as of 2-23-2023. MPF Foundation Drawings have been issued as of 2-20-2023. Bid Packs have been issued as of 2-21-2023. 1. The "Project" of which the "Work" of this Contract is a part, is titled New High School #4 for Prosper ISD and is composed of a new High School facility and related site work located in Prosper, Texas. 2. The "Work" of this Contract is titled New High School #4 and is defined in the Contract Documents to include, but not necessarily to be limited to: a. A new High School and all ancillary buildings and surrounding facilities, including all mechanical, electrical, plumbing, and general construction work. 3. Related Work: a. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 01 of these Specifications. b. The work of other contracts is described in various contract documents prepared therefore, some of which are in the possession of the Owner and are available for inspection by interested parties. Revised bid forms were issued 2-27-2023.

Details

2 Stories Above Grade, 649,000 SF.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents