Similar Projects
Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Bidding
Carrabassett, ME

Pavement Milling, Ultra - Thin Bonded Wearing Course, with Safety Improvements
Bidding
Rangeley, ME

Sidewalk Construction/Located on Route 142, Beginning at the Kingfield Elementary School and Continuing 0.57 Miles Northerly to the Existing Sidewalk at High Street
Results
ME

New Muddy Brook Bridge Wearing Surface Replacement
Results
New Sharon, ME 04955

Hot Mix Asphalt Overlay With Safety Improvements
Results
ME

Bald Mountain Road Culvert Replacements
Results
Less than $450,000 est. value
Rangeley, ME

(LCP) Light Capital Paving
Results
Anson, Farmington, New Sharon, Starks, Town Of Chesterville, ME 04938

(LCP) Light Capital Paving
Results
Chesterville, Farmington, Fayette, Temple, Town Of Chesterville, Wilton, ME 04938

On Call Maintenance Paving/Located in Regions 1-5
Results

Pavement Milling, Ultra-Thin Bonded Wearing Course with Safety Improvements
Results
Farmington, Town Of Chesterville, ME 04938

Crack Sealing
Results
Phillips, Strong, Wilton, ME 04966

On Call Milling Machines and Grinders
Results

Overlook Sidewalk
Results
Less than $650,000 est. value
Rangeley, ME 04974

Culvert Replacement and Cleaning
Results
Strong, ME 04983

Culvert Replacements
Results
Byron, Roxbury, ME 04275

Last Updated 05/04/2020 10:18 AM
Project Title

Loon Lake Road Rangeley

Physical Address View project details and contacts
City, State (County) Rangeley, ME   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will generally include: Box cut full depth road reconstruction, new and replacement storm drainage, new sidewalks, and associated earthwork and erosion & sedimentation control. Project is to be substantially completed by September 30, 2020.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents