Similar Projects
Annual Contract/Painting and Weatherproofing
Term Contract
Bidding
FL

Palm Beach County Sheriff's Office Exterior Hardening
Post-Bid
West Palm Beach, FL

CM-at-Risk Services - Architecture Building Exterior Envelope Repair
Post-Bid
Less than $5,000,000 est. value
Gainesville, FL

Sunshade Structure - EPA Gulf Breeze, FL
Results
Gulf Breeze, FL 32561

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

UCF Downtown/Dr. Phillips Academic Commons
Construction
$66,000,000 est. value
FL

Lee County Downtown Jail Corridor Ceiling Replacement
Construction
Fort Myers, FL 33901

54--Building Roof Top Guardrail System
Post-Bid
Panama City, FL 32407

TGK Facility Re-Roof - Pressure Wash and Seal Exterior Building
Results
Less than $3,350,000 est. value
FL

Awning Repair, Recover and Install
Post-Bid
Less than $25,000 est. value
Sarasota, FL 34235

N--Service: Recover Awnings Building 2 and 42
Results
Tampa, FL 33612

Exterior Painting Projects for Vernon E. Hargray Youth Enrichment Center and Sunset Lakes Community Center
Post-Bid
Miramar, FL 33025

UCF Spectrum Stadium Rust Remediation
Results
Orlando, FL 32816

Gutter Replacement
Post-Bid
Palm Harbor, FL 34683

Facility Maintenance Services for Cecil Airport
Results
Jacksonville, FL 32221

Last Updated 07/07/2020 03:52 PM
Project Title

Repair/Paint Schoolhouse Museum

Physical Address View project details and contacts
City, State (County) Fort Walton Beach, FL 32548   (Okaloosa County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

It is the intent of this solicitation to secure a qualified contractor to replace the wood, seal, and paint the exterior of the Schoolhouse building at the Heritage Park and Cultural Center. The Camp Walton Schoolhouse Museum is approximately 59 ft x 25 ft, with a front and rear porch, and has been painted numerous times. Work is routine maintenance of the building. Though it is a historic building, no special rules apply regarding this maintenance work. Contractor to replace all outside siding, soffit, trim, overhead ceiling on front porch and rear porch. Front porch, rear porch hand rails, steps and flashing. Leave existing porch, flooring, windows and doors. Replace facia metal flashing and facia board. Replace the freeze board. Remove existing steeple and replace with new material. Repair school bell operational device to be able to operate from School House. Replace moisture barrier with new house wrap/moisture barrier product. Replace outside siding with 105 Drop D 6” Kiln Dried and Treated (KDAT) material. Seal entire building. Caulk all wood butt joints. Paint with a Satin Exterior Enamel. Beyer Exterior Ultra or comparable.

Details

Division 06 - Wood, Plastics, and Composites, Wood Trim, Wood Fasciae and Soffits.
Division 07 - Thermal and Moisture Protection, Siding.
Division 09 - Finishes, Painting, Exterior Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents