Project Title | BCS Elevator Replacements |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35203 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Conveying Systems |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,313,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes, but is not limited to, the demolition and installation of two (2) passenger elevators and all related work as indicated on the Bid and Construction Documents. The project is located at the Birmingham Board of Education, 2015 Park Place, Birmingham, Alabama, 35203. The demolition and installation of the two elevators must be completed in sequential order so that elevator access is maintained for the entire project duration. A cashier's check or bid bond payable to Birmingham Board of Education, Birmingham, Alabama, in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as amended, and must show such evidence of license before bidding or bid will not be received or considered by Architect or Owner; The bidder shall show such evidence by clearly displaying their current license number on the outside of the sealed envelope in which the proposal is delivered; Bidder must also include their current license number on the Proposal Form. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of NINETY (90) days. This project is being bid without sales taxes according to Act 2013-205 (of the Alabama Legislature). However, sales tax for the base bid and all other bid items must be accounted for on the contractor's Bid Proposal Form. ABC Form C-3A indicates how the sales tax shall be accounted for on the bid proposal form and shall be modified by the project architect as appropriate for bid items on each project. COMPLETION TIME: Work shall commence on the earlier of either the date of the owner's written "Notice to Proceed" or the contractor's receipt of the fully executed contract and shall be "Substantially Complete" within 336 Consecutive Calendar Days thereafter. SUPERVISION: Contractor to provide Superintendent(s) to ensure proper supervision for all work. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in their judgment, the best interests of the Owner will thereby be promoted. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |