Similar Projects
Electric System Line Aerial Construction and Maintenance
Term Contract
Post-Bid
Granbury, TX 76048

Photovoltaic Power Systems and Component
Term Contract
Post-Bid
Austin, TX 78759

Generator Inspection, Maintenance, Testing & Repair Service
Results
Edinburg, TX 78541

Performance Hall Equipment Upgrade
Results
$341,960 est. value
Mesquite, TX 75149

Annual for Misc Electrical Wire for Cstores
Post-Bid
Houston, TX 77020

Studio Production Lights Upgrade
Results
$77,201 est. value
Dallas, TX

Parking Lot Improvement Project
Post-Bid
San Perlita, TX 78590

Zavala Electrical Improvements
Results
Edinburg, TX

Campuswide Lighting Upgrades
Demolition
Post-Bid
Edinburg, TX 78539

Digital Marquee Replacement Project
Results
$389,057 est. value
Rockwall, TX 75032

RFCSP Terminal A Electrical System Expansion at San Antonio International Airport
Post-Bid
Less than $2,800,000 est. value
San Antonio, TX 78205

Job Order Contract for Electrical Services
Term Contract
Results
Less than $500,000 est. value
Round Rock, TX

Electrical Maintenance and Repair Services for the Dallas District
Post-Bid
Mesquite, TX 75150

Standby Generator for Fire Department
Results
Less than $200,000 est. value
Houston, TX

Energy Conservation and Performance Enhancements
Term Contract
Post-Bid
O'Donnell, TX 79351

Reported 04/07/2020 12:00 AM
Project Title

Repair Circuits 2/3, Sheppard AFB, TX

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX 76311   (Wichita County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This is a tw o-phase competitive bid solicitation for a firm, fixed-price contract. It w ill be aw arded using the Best Value Trade-Off process. The preliminary scope of this contract includes, but is not limited to, design, construction, and demolition required to replace 15,000 LF of O/H and 19,700 LF of U/G 15kV class electrical distribution that comprises Circuits 2 and 3 at Sheppard AFB, Wichita Falls, Wichita County, Texas. Line replacement w ill include all associated appurtenances including pad mounted transformers and sw itchgear, metering, street lighting, and manholes connected using concrete encased duct banks. Where feasible reutilize existing manholes and duct banks and provide new where required. Replace 12,000 LF of street lighting w ith new along 1st and 9th Avenues and along Avenue J and Moates Avenue. Replace lightning protection and grounding systems. Provide U/G distribution configuration in compliance w ith UFC 3-550-01. Provide energy smart metering. To be perf ormed at Sheppard AFB, Wichita Falls, Wichita County, Texas.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents