Similar Projects
Chair City Church Parking Expansion
Conception
Gardner, MA 01440

Bituminous Concrete in Place
Post-Bid
Leicester, MA

Roadwork
Post-Bid
Southborough, MA

Roadway Reconstruction and Related Work (Including Signals) Along A Section of Hartford Avenue North, High and Main (Route 140) Streets (Phase 2)
Results
Less than $3,422,718 est. value
Upton, MA 01568

Scheduled and Emergency HMA Pavement and Paved Waterway Repairs at Various Locations
Results
Less than $180,000 est. value

Miscellaneous Bituminous Type I Repairs - Handwork
Post-Bid
$9,500 est. value
Shrewsbury, MA

Scheduled and Emergency Roadway Repairs and Related Work (Including Slope Stabilization) at Various Locations
Results
Less than $675,000 est. value

Town Center Improvements Project
Post-Bid
$900,000 est. value
West Brookfield, MA

Complete Streets Project
Results
$525,000 est. value
Gardner, MA

Paving Roads in Hubbardston
Post-Bid
$352,000 est. value
Hubbardston, MA

River Road Rehabilitation
Results
Less than $3,032,620 est. value
Clinton, MA

Bituminous Concrete
Post-Bid
Charlton, MA

Reclamation and Paving, Westville Lake, Southbridge, Ma
Results
$100,000 to $250,000 est. value
Southbridge, MA

Stone Seal, Double Stone Seal and 10% Asphalt Rubber Surface Treatment
Post-Bid
Charlton, MA

Pavement Preservation and Related Work at Various Locations
Results
Less than $937,060 est. value

Last Updated 05/11/2022 07:07 AM
Project Title

Transportation Improvement Project - Flanders Road

Physical Address View project details and contacts
City, State (County) Westborough, MA 01580   (Worcester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed intersection improvements include widening Flanders Road for approximately 1,350 feet to accommodate 11-foot travel lanes, an exclusive 10-foot left-turn lane, and 5-foot shoulders; a shared-use path for improved bicycle access; installation of new sidewalk/wheelchair ramps and crosswalk for pedestrian and bicycle access; reconstructing an existing drainage outlet with new headwall and pipe extension; constructing a detention basin and outlet control structure; constructing water main and hydrant improvements; pavement markings and signing; pavement milling and overlay; and the installation of a new fully actuated traffic control signal with pedestrian signal equipment including accessible pedestrian signal (APS) pushbuttons and countdown heads for improved pedestrian accessibility and safety. The project also includes an approximately 1,700 linear foot extension of the BWALT. The trail will be an 8-foot-wide stone dust multi-use trail located adjacent, but outside the curb line of the proposed extension of West Park Drive to Flanders Road.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents