Similar Projects
Cape Girardeau Municipal Airport - Taxiway Alpha and Delta Rehabilitation - City of Cape Girardeau
Infrastructure
Conception
$9,800,000 CJ est. value
Cape Girardeau, MO 63701

Cape Girardeau Municipal Airport - Taxiway Alpha and Delta Rehabilitation - City of Cape Girardeau
Infrastructure
Conception
$9,800,000 CJ est. value
Cape Girardeau, MO 63701

Sherwood Drive / Hood Drive / Brookwood Drive Drainage Improvements Project
Infrastructure
Bidding
$300,000 CJ est. value
Cape Girardeau, MO 63701

Hubble Ford Bridge Replacement
New Construction, Infrastructure
Post-Bid
Jackson, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Grading Improvements CR 525
Infrastructure
Results
Jackson, MO

Grading, Pavement, and Bridge Replacement
New Construction, Infrastructure
Results
$1,000,000 to $2,500,000 est. value
MO

Lutesville Solar Project
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Cape Girardeau, MO 63701

Airport Terminal - City of Cape Girardeau
New Construction, Infrastructure - 20,000 SF
Pending Verification
$6,000,000 CJ est. value
Cape Girardeau, MO 63701

Route K School Corridor Safety Improvements - City of Cape Girardeau
Infrastructure
Conception
$500,000 CJ est. value
Cape Girardeau, MO 63701

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Plant Mix Bituminous Paving
Infrastructure
Results
Cape Girardeau, MO 63701

Sprigg Street Convenience Store
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Cape Girardeau, MO 63701

Route K School Corridor Safety Improvements - City of Cape Girardeau
Infrastructure
Conception
$500,000 CJ est. value
Cape Girardeau, MO 63701

Job Order Contract for Concrete Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Last Updated 03/09/2023 05:13 PM
Project Title

County Road 420 and 436 Bridge Replacements New Bridge Nos. 0020001 and 2240022

Physical Address View project details and contacts
City, State (County) Jackson, MO 63755   (Cape Girardeau County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $387,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 9, 2023, bids were canceled. No definite date for the rebid.**  COUNTY ROAD 420 & 436 BRIDGE REPLACEMENTS NEW BRIDGE NOS. 0020001 & 2240022 BRO-B016(32) CAPE GIRARDEAU COUNTY, MISSOURI Sealed proposals, addressed to: CAPE GIRARDEAU COUNTY COMMISSION #1 BARTON SQUARE JACKSON, MO 63755 The project consists of furnishing all labor, tools, equipment and materials for construction of two replacement bridges including removal of the existing bridges and improvements, excavation and embankment construction, pile placement, reinforced concrete end bent construction, furnishing and placement of precast, prestressed concrete deck beams, rip rap placement, approach road construction and surfacing, guardrail, restoration of adjacent grades, seeding and mulching and any other associated items to complete the project in accordance with the plans and specifications prepared by Koehler Engineering and Land Surveying, Inc. The contract provides for the furnishing of all labor, equipment, and materials necessary for the improvement and construction required per the improvement plans, specifications and construction documents. Sealed Proposals should be clearly marked "Bid for County Road 420 and 436 Bridge Replacements". All bidders are required to purchase plans and specifications to submit a bid for this project. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The Engineer will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon an will not be binding or legally effective. The Cape Girardeau County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. The prime contractor must go through MoDOT pre-qualification process and be on the MoDOT approved contractor listing. The prime contractor must have a fully responsive contractor questionnaire on file with the Missouri Highways and Transportation Commission (MHTC) at least seven (7) days prior to the date and hour of the bid opening (See Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2011). The prime contractor on a project must perform, with its own staff, contract work amounting to NOT less than 30% of the total original contract price. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive all informalities, with MoDOT concurrence, not involving price, time or changes in work and to negotiate contract terms with the Successful Bidder. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher. Pursuant to 285.530 R.S. Mo, the bidder must affirm its enrollment and participation in a federal work authorization program with respect to the employees proposed to work in connection with the services requested herein by including with the bid proposal 1) submitting a completed, notarized copy of AFFIDAVIT OF WORK AUTHORIZATION and 2) providing documentation affirming the bidder's enrollment and participation in a federal work authorization program with respect to the employees proposed to work in connection with the services requested herein. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. The right is reserved to reject any or all bids by the Cape Girardeau County Commission with MoDOT concurrence. The DBE Goal for this project is 5.0%. No 2nd tier subcontracting will be allowed on this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents