Similar Projects
Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Little Goose Dam Qualitrol Gas Analyzer
Alteration
Design
Dayton, Lacrosse, WA 99143

Police Court Campus Emergency Generator
Alteration
Bidding
Mount Vernon, WA 98273

Admin Building Panel Replacement
Alteration
Bidding
Pullman, WA 99163

Prequalifying Contractors for Construction Work for 2022
Infrastructure
Post-Bid
WA 98206

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Bellingham International Airport Replace Apron Lighting Project
Infrastructure
Results
Bellingham, WA 98225

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

Electrical Work Order Contract
Term Contract, Alteration
Bidding
WA

MHR Residential Electrical
Alteration
Post-Bid
Puyallup, WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Battery Electric Bus General Contractor Charging Station Installation
Infrastructure
Bidding
Vancouver, WA 98683

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Reported 02/23/2022 12:00 AM
Project Title

Spaw Phillips Western Red Cedar Transmission Poles

Physical Address View project details and contacts
City, State (County) Kennewick, WA   (Benton County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Benton County (District) is in the process of building a new 115kV transmission line to tie two single source transmission lines together with a new 15-mile line. The route and construction of this line requires the procurement of Spaw-Phillips – Western Red Cedar Transmission Poles.

Details

Division 26 - Electrical.
Division 33 - Utilities, Electrical Utility Transmission and Distribution, Electrical Utility Poles.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents