Similar Projects
Storm Drain Lining at Federal Courthouse
Term Contract
Design
$25,000 to $100,000 est. value
Fargo, ND 58102

Fargo Moorhead Metropolitan Area Flood Risk Management Project
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Fargo, ND

Upper Swan Creek Channel Improvements 2020
Infrastructure
Bidding
$1,190,000 est. value
West Fargo, ND

2021 Box Culvert
Post-Bid
ND

Fargo-Moorhead Metropolitan (FMM) Area Flood Risk Management Project - Drain 27 - Sources Sought
Post-Bid
$5,000,000 to $10,000,000 est. value
Fargo, ND

Southwest Regional Pond Phase 1
Results
Less than $6,195,466 est. value
Fargo, ND 58102

Oak Grove Flood Risk Management
Results
$7,518,681 est. value
Fargo, ND

Osgood Golf Course Slope Stability Improvements
Infrastructure
Post-Bid
$440,000 est. value
Fargo, ND 58104

Riverwood Flood Risk Management
Results
$3,196,053 est. value
Fargo, ND

Structure Replacement - Box Culvert Replacement
Renovation, Infrastructure
Post-Bid
ND

Box Culvert
Results
$1,419,405 est. value
ND

Grading, Crushed Concrete, Box Culvert Removal, and Reinforced Concrete Box Culvert
Infrastructure
Post-Bid
ND

Elm Circle Flood Risk Management
Results
$991,522 est. value
Fargo, ND

Royal Oaks and River Drive Flood Risk Management
Results
$1,103,464 est. value
Fargo, ND

Fargo-Moorhead Metropolitan (FMM) Area Flood Risk Management Project - Southern Embankment Reach SE-2A
Term Contract
Results
$10,000,000 to $25,000,000 est. value
Fargo, ND

Last Updated 04/29/2022 01:23 AM
Project Title

Fargo Project - North Pond

Physical Address View project details and contacts
City, State (County) Fargo, ND 58103   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,446,856
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide aesthetic improvements to enhance a storm water detention pond for Red River Human Services that has been constructed on Park land.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents