Similar Projects
Woodson Village Rehabilation
Results
$5,055,913 est. value
College Station, TX 77842

Fleet Upgrades - Oil Pit and Storm Drain
Infrastructure
Results
$278,521 est. value
College Station, TX 77840

Water, Sewer, Drainage and Paving Improvements for Southern Pointe Subdivision - Section 201
Infrastructure
Results
TX

Southern Pointe Section 101
Results
College Station, TX 77845

CTE Complex Sewer Service
Infrastructure
Results
$150,000 est. value
Bryan, TX 77807

Medical District Sewer Interceptor Phases II and III
Results
$308,000 est. value
College Station, TX

CSU Northgate Manhole & Conduit Installation
Infrastructure, Alteration
Results
College Station, TX 77842

Pipe Boring & Slip Lining
Infrastructure
Results
$143,100 est. value
College Station, TX 77845

Water, Sanitary, Drainage and Paving Facilities for Southern Pointe Section 200
Results
TX

Midtown Reserve Subdivision Phase 106
Post-Bid
College Station, TX 77840

Palasota Drive - Phase 2 Reconstruction
Infrastructure
Results
$2,008,967 est. value
Bryan, TX 77803

Midtown City Center Phase 301 Replat
Infrastructure
Post-Bid
College Station, TX

Rock Prairie Management District No. 2 Midtown City Center Phase 301
Infrastructure
Post-Bid
College Station, TX 77844

Midtown Reserve Subdivision Phase 107
Post-Bid
College Station, TX

Water, Sewer, Drainage and Paving Improvements for Southern Pointe Subdivision- Section 103 and 119
Infrastructure
Results
College Station, TX 77845

Last Updated 02/03/2022 03:59 PM
Project Title

Carter Creek Gravity Main

Physical Address View project details and contacts
City, State (County) College Station, TX 77845   (Brazos County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $314,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will install approximately 5,462 feet of 36-inch RFP sewer line. Starting at the downstream end, the line will tie into an existing 48-inch line south of Rock Prairie Road near the City’s forestry building and old landfill. It will move upstream crossing Rock Prairie Road traveling northeast and parallel Bradley Road. It will turn northwest and follow the Entergy overhead power and terminate at the upstream manhole near Green Jay Drive.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents