Similar Projects
Capital Improvement - Troy City School District
Renovation
Conception
$1,100,000 CJ est. value
Troy, NY 12180

Wayfinding System
Infrastructure
Conception
$200,000 CJ est. value
Troy, NY 12180

Troy Winter Garden at Quackenbush Square
Addition, Demolition, New Construction, Infrastructure, Renovation - 80,000 SF
Design
$40,000,000 CJ est. value
Troy, NY 12180

Forrest Ridge Residential Development
New Construction, Infrastructure
Design
$40,000,000 CJ est. value
Wynantskill, NY 12198

River Street (South Troy Industrial Park Road Project, Phase II)
Infrastructure
Bidding
$6,000,000 CJ est. value
Troy, NY 12180

Bridge Replacement of CR 42, Taborton Road
Demolition, New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Sand Lake, NY 12153

One Monument Square
New Construction, Infrastructure - 179,000 SF
Post-Bid
$64,000,000 CJ est. value
Troy, NY 12180

Tempel Lane Extension and Third Avenue Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
East Greenbush, NY 12061

Golf Course Chemical Storage Building
New Construction, Infrastructure
Results
$63,037 CJ est. value
Troy, NY 12180

Cross Street Pump Station Upgrade
Renovation, Infrastructure
Results
$146,000 CJ est. value
Troy, NY 12180

Brunswick CSD 2020 Capital Improvement Project
Renovation
Construction
$4,390,000 est. value
Troy, NY

2nd Dyke Road Culvert
Infrastructure
Construction
$700,000 CJ est. value
Sand Lake, NY 12153

River Street Senior Housing
New Construction, Infrastructure
Pending Verification
$46,400,000 CJ est. value
Troy, NY 12180

Valley Avenue Apartments and Restaurant
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Troy, NY 12180

Cottage Street Garages
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Troy, NY 12180

Last Updated 05/10/2023 04:21 PM
Project Title

2021 Capital Improvement Project Contract 100: Site Construction

Physical Address View project details and contacts
City, State (County) Troy, NY 12182   (Rensselaer County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders must submit a sealed list naming each subcontractor and the amount to be paid to each. The list may not be changed unless the public owner finds a legitimate construction need, including a change in specifications or costs or use of a project labor agreement (PLA), and must be open to public inspection. Contractor shall be aware of new requirement under the Wicks 2008 law reform Bids shall be on the form provided in the documents, prepared in duplicate as set forth in the Instructions to Bidders and enclosed in an envelope bearing on its face the name and address of the bidder and the title of work to which the proposal relates. If submitting for more than one contract, submit each contract bid in separate envelope. Any Bidder upon returning such set in good condition within thirty (30) days after Bid opening will be refunded the deposit. Any Bidder after thirty (30) days after Bid opening or Non-Bidder so returning such a set will not be refunded. The Board of Education hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the school district. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that, in the case the contract is awarded to him, he will then, ten days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and the Bidder shall not withdraw his Bid for a period of forty-five days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to other provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed. 49-06-01-06-0-006-016

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents