Similar Projects
Construction of 2017 Newington CDBG
Post-Bid
Newington, GA

FY 2019 Southeast WWTP Improvements
Post-Bid
Douglas, GA

Flat Creek WRF Sludge Storage Addition
Results
Less than $1,473,750 est. value
Gainesville, GA 30501

RM Clayton WRC Digester Improvements and Rehabilitation Phase One
Results
Atlanta, GA 30318

WWTP Improvements and Glynn Addy Pump Station Rehabilitation
Construction
$3,500,000 est. value
Stockbridge, GA

Westside WWTF Improvements
Post-Bid
Eatonton, GA

2018 Wastewater System Capital Improvements
Results
$2,500,000 est. value
Cedartown, GA

Eastside WWTF Improvements
Post-Bid
Eatonton, GA

A. Scott Emmons WRF at the Little River
Term Contract
Results
Less than $140,000 est. value
Covington, GA

Wastewater Treatment Plant Maintenance and Upgrades
Post-Bid
Less than $650,000 est. value
Darien, GA

Wastewater Treatment Facility Improvements
Results
$1,200,000 est. value
Hiawassee, GA 30546

Big Flat Creek WRF 3.33 MGD Upgrade
Post-Bid
Loganville, GA 30052

UV Disinfection System Replacement
Results
Less than $164,927 est. value
Statesboro, GA 30458

Big Flat Creek WRF - Highway 81 Entrance Security Improvements
Post-Bid
Loganville, GA 30052

Snapfinger Waste Water Treatment Plant I.L.S. Piping Modifications
Results
Decatur, GA

Reported 12/21/2018 10:39 AM
Project Title

Mineral Springs Wastewater Treatment Plant Expansion to 0.95 MGD

Physical Address View project details and contacts
City, State (County) Newnan, GA   (Coweta County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method
Project Status Construction Commenced July 2018
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Consist of furnishing all materials, tools and equipment and performing all labor necessary for constructing the Mineral Springs Wastewater Treatment Plant Expansion to 0.95 MGD. eadworks improvements, including new screens. New grit removal system. New secondary pump station. New deep bed filters. New cascade aeration structure Bulk liquid alum feed system. Upgrades to Control Building, including new blowers. Digester air supply system upgrades. Miscellaneous piping upgrades and modifications and Electrical and instrumentation upgrades and modifications.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents