Similar Projects
Bathroom Renovation
Renovation
Sub-Bidding
$24,850 CJ est. value
Lowell, MA 01854

Contracted Tree Work
Term Contract
Sub-Bidding
$30,000 CJ est. value
Acton, MA 01720

Porch Repair
Alteration
Post-Bid
Holliston, MA 01746

JFK Plaza Front Steps Renovation
Alteration
Post-Bid
$300,500 est. value
Lowell, MA 01852

Devens Household Hazardous Waste Awning Construction Work
Alteration
Results
$77,000 est. value
Devens, MA 01434

Stair Replacement, Barre Falls Dam, Barre, MA
Term Contract
Results
Barre, MA 01005

King Stairs - Concrete Repair
Alteration
Post-Bid
$65,000 est. value
Framingham, MA 01701

Construction of a Steel Canopy
Alteration
Results
$250,000 est. value
Tyngsborough, MA

Building Envelope Repair Project - Founders Rink
Alteration
Post-Bid
$125,000 est. value
Somerville, MA 02143

Construction of Four Egress Door Canopies
Alteration
Results
$100,000 est. value
Tyngsborough, MA

Wannalancit Business Center Facade Repair - Masonry Work of Exterior Masonry Wall Elevations 1 and 2
Alteration
Post-Bid
$168,059 est. value
Lowell, MA

Bryant Manor Loading Dock and Stair Renovations
Alteration
Results
Somerville, MA 02145

Repairs to Exterior Envelopes at Multiple Buildings - General Bid
Alteration
Post-Bid
$1,700,000 est. value
Framingham, MA 01701

Chevalier Theatre Facade Restoration
Alteration
Results
$164,483 est. value
Medford, MA 02155

Siding Replacement
Alteration
Post-Bid
$193,000 est. value
Tyngsborough, MA

Last Updated 06/21/2023 02:37 PM
Project Title

Sidewalk Saw Cutting at Various Locations

Physical Address View project details and contacts
City, State (County) Arlington, MA 02476   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall provide all the materials and perform all the work necessary for and incidental to the work as described and shown in the Contract Documents for the following project Work on this project is restricted to a standard 8-hour day, 5-day week, with the Prime Contractor and all Subcontractors working on the same shift. No work shall be performed on this Contract on Saturdays, Sundays, or Holidays without permission from the Department of Public Works. Questions regarding this Invitation to Bid should be directed to the Town of Arlingtons Purchasing Agent at mdenatale@town.arlington.ma.us. The work under this contract consists of all labor, materials and equipment necessary to remove trip hazards from concrete sidewalks at various locations in the Town of Arlington. Sidewalk Saw Cutting at Various Locations

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents