Similar Projects
Preventative Maintenance and Service for 7 Natural Gas Fired Furnaces and 1 Oil Fired Clean Burn Unit Located in Various Buildings
Post-Bid
Less than $45,000 est. value
Tewksbury, MA

Removal of Existing Vaulted AST Oil Storage Tank
Post-Bid
Bolton, MA

Emergency Spill Response and Underground Vault/Manhole Pump Out Services
Term Contract
Results
Holyoke, MA

WPCF Fuel Tank and Concrete Vault Removal
Results
Less than $75,000 est. value
Turners Falls, MA 01376

Vernon Street Gas Regulator Station Installation
Post-Bid
Less than $1,250,000 est. value
Wakefield, MA 01880

Underground Storage Tank Removal & Retaining Wall Reconstruction, Jean Elder 667-3
Results
$30,350 est. value
Amherst, MA

Standby Generator Fuel Tank Replacement
Post-Bid
Less than $45,000 est. value
North Attleborough, MA 02760

Diesel Exhaust Fluid Tank
Results
Boston, MA 02129

Natural Gas Regulator Station
Post-Bid
$150,000 est. value
Wakefield, MA 01880

Removal of One 12,000 Gallon Double Walled, Fiberglass, No. 2 Fuel Oil Underground Storage Tank
Results
Less than $30,000 est. value
Agawam, MA

Gas Main Replacements
Post-Bid
Wakefield, MA

Fuel Storage Tank Maintenance Service
Results
Less than $595,900 est. value
Boston, MA 02129

Z1GC--Fuel Reconditioning
Post-Bid
Boston, MA

Fuel Tank Removal and Installation
Results
$345,500 est. value
Lunenburg, MA 01462

Maintenance and Repair of Fuel Pump Dispensers and Tank Monitoring Systems
Post-Bid
Boston, MA

Last Updated 10/20/2021 08:18 AM
Project Title

Underground Storage Tank Removal and Disposal David Prouty High School and Know Trail Junior High School

Physical Address View project details and contacts
City, State (County) Spencer, MA 01562   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $65,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes: Removal and disposal of two (2) fifteen thousand (15,000) gallon underground storage tanks (USTs) and associated site restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents