Similar Projects
Needlepoint Bipolar Ionization
Bidding
Charlotte, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

Replace HVAC Equipment/Systems - Charlotte
Post-Bid
$1,000,000 to $5,000,000 est. value
Charlotte, NC

HVAC Parts and Equipment
Results
Charlotte, NC

Charlotte North Carolina HVAC Replacement
Results
$120,000 to $170,000 est. value
Charlotte, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

HVAC Replacements at Wilson Air North
Post-Bid
Charlotte, NC 28208

CATS North Tryon Underpass and Old Concord Road HVAC Addition for Remote Ethernet Switch Cabinets
Results
Less than $25,000 est. value
Charlotte, NC 28273

Weddington Elementary School's Chiller Replacement
Post-Bid
Matthews, NC 28104

Cats NTUP and OCR P and R HVAC Addition for RES Cabinets
Results
Less than $25,000 est. value
Charlotte, NC 28200

HVAC Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Charlotte, NC 28277

HVAC Replacements at Honeywell Building
Results
Charlotte, NC

Replacement of Seven (7) Roof Top Air-Conditioning Units at JV Washam Elementary School
Post-Bid
Cornelius, NC 28031

Replacement of Unit Ventilators at South Charlotte Middle School
Results
Charlotte, NC 28277

Needle Point Bipolar Ionizers
Post-Bid
Charlotte, NC

Reported 11/02/2020 09:26 AM
Project Title

Gantt Center and Bechtler Museum Humidifier Upgrades

Physical Address View project details and contacts
City, State (County) Charlotte, NC 28202   (Mecklenburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work at Bechtler consists of replacing an existing isothermal humidifier serving AHU-B-3 with an adiabatic humidifier; replacing existing precision air conditioning unit PAC-B-1 serving basement; adding an adiabatic humidifier to serve AHU-B-2; rebalancing the outside air and return air for AHU-B-1, AHU-B2 and AHU-B-3 as a result of the recently installed needle point bi polar ionization systems; and electrical modification associated with replacing mechanical equipment. The work at Gantt consists of replacing existing isothermal humidifiers serving RTU-1 and RTU-2 with adiabatic humidifiers; rebalancing the outside air and return air for RTU-1 and RTU-2 as a result of the recently installed needle point bi-polar ionization systems; and electrical modification associated with replacing mechanical equipment. Both buildings will require concrete pad work, equipment fencing work and gypsum ceiling patch and repair work. Project Location: 1. Harvey B. Gantt Center 551 South Tryon Street Charlotte, North Carolina 28202. 2. Bechtler Museum 420 South Tryon Street Charlotte, North Carolina 28202.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents