Similar Projects
The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

HVAC and Mechanical Products
Term Contract
Post-Bid

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

REF Waste Heat Boiler (WHB) Unit Preventive Maintenance and Repair Services
Term Contract
Results
$500,000 est. value
Cleveland, OH

HVAC Cleveland Coast Guard
Post-Bid
Cleveland, OH 44114

Industrial Air Quality Testing Services
Results
Bratenahl, Cleveland, OH 44199

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

Complete Boiler Replacement at Mount Auburn Manor
Results
$250,000 to $400,000 est. value
Cleveland, OH

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Maintenance, Repair, Enhance and/or Replacement of Heating, Ventilation and Air Conditioning Systems, Including Rental
Results
Less than $2,649,000 est. value
Cleveland, OH

HVAC & Facility Systems, Automation, Installation, Service and Related Products & Services in Ohio
Term Contract
Post-Bid

HVAC Maintenance
Results
$244,163 est. value
Strongsville, OH

Lincoln West High School Rooftop Equipment (Chiller) Project
Alteration
Post-Bid
Cleveland, OH 44109

Solon Orchard Middle School Library and Office HVAC Improvements
Results
$225,000 est. value
Solon, OH

Fifty-One 51 Site Basic Preventative Maintenance Program
Alteration
Post-Bid
Cleveland, OH 44106

Last Updated 05/04/2022 08:10 AM
Project Title

Fire Station No. 2 HVAC Units Replacement & Roof Hatch/Ladder Access

Physical Address View project details and contacts
City, State (County) Shaker Heights, OH   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace two (2) existing Carrier FB4A HVAC Unit w/condensers and meet the requirements as indicated and/or specified. Work also includes the installation of a Roof Hatch and Ladder access. The Ladder access will need to penetrate through a plaster ceiling above the acoustical tile grid line. The contractor will match a 36”x36” access hole for the Roof Hatch. The proposed acoustical ceiling grid shall encompass the access Ladder installed in the Fire Station’s weight room. The scope shall include any other items not specifically listed that are required to provide for a complete and fully operational system

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents