Similar Projects
Bayrock Mixed-Use
New Construction - 18,338 SF
Conception
Walnut Creek, CA 94596

Duke Richmond Industrial Building
New Construction, Demolition - 153,803 SF
Conception
$10,000,000 CJ est. value
Richmond, CA 94804

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

The Lexington
New Construction - 54,462 SF
Design
$5,000,000 to $10,000,000 CJ est. value
El Cerrito, CA 94530

Pittsburg High School New Softball Field
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

Brentwood Various Streets and Roads Preservation
Infrastructure
Bidding
$576,000 CJ est. value
Brentwood, CA 94513

532 Mt Diablo Blvd
New Construction, Infrastructure
Sub-Bidding
$13,600,000 CJ est. value
Walnut Creek, CA 94596

532 Mt Diablo Blvd
New Construction, Infrastructure
Sub-Bidding
$13,600,000 CJ est. value
Walnut Creek, CA 94596

Lburrey Office
New Construction, Renovation - 2,735 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Antioch, CA 94509

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Crow Canyon Road Widening Project
Infrastructure
Results
$10,400,000 est. value
San Ramon, CA 94583

County Office Building
Renovation, Demolition
Construction
$58,000,000 est. value
Martinez, CA 94553

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Last Updated 08/26/2022 07:03 PM
Project Title

West Cutting Boulevard Distribution Facility

Physical Address View project details and contacts
City, State (County) Richmond, CA 94804   (Contra Costa County)
Category(s) Commercial, Green Building, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, LEED Certified, Manufacturing/Processing Plant, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

A 144,752 square feet concrete tilt-up warehouse building for industrial use with 4,750 square feet office at the ground floor level and another 4,245 square feet office at the second level. Total building area of 153,747 square feet. Project requirement: 1. Project Labor Agreement / Union only. 2. Silver LEED Certification.

Details

,, 153,747 SF - 2 Stories Above Grade, 8,995 SF. 144,752 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents