Similar Projects
New Pump Station
New Construction
Conception
$974,500 est. value
Waterloo, WI

Ridgeland Community Well Drilling
Infrastructure
Bidding
$300,000 CJ est. value
Oneida, WI 54155

Truax Lift Station Replacement
Renovation, Infrastructure
Bidding
$1,160,000 CJ est. value
Madison, WI 53715

Generator Repairs (74th and Oklahoma )
Renovation
Sub-Bidding
$100,000 CJ est. value
Milwaukee, WI 53219

Big Buck Lift Station Improvements Phase I
Post-Bid
Kenosha, WI 53142

SMU Lift Station Replacement
Post-Bid
New Franken, WI

Booster Pumping Station, Contract Package 3 and 3A
Results
Waukesha, WI 53186

Northwest Water System Improvements Booster Station
Renovation
Results
Rice Lake, WI

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Drilling a New Well at Cleveland Town Hall
Infrastructure
Bidding
$300,000 CJ est. value
Cleveland, WI 53015

Pump Station 17 Rehabilitation and Force Main Relief Phase 2
Renovation, Infrastructure
Post-Bid
Verona, WI

Clayton Water Distribution Booster Pump Facility
New Construction
Results
WI

Razing and Removing Buildings
Demolition, Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Mellen, WI 54546

Landfill Lift Station Modifications
Renovation
Post-Bid
Appleton, WI 54911

Pumping Stations No. 6 and No. 10 Variable Frequency Drive Upgrades
Renovation
Results
$200,000 est. value
Madison, WI 53714

Last Updated 08/08/2022 05:04 AM
Project Title

Arlene Drive Lift Station Upgrade

Physical Address View project details and contacts
City, State (County) Hartland, WI 53029   (Waukesha County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $226,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves replacement of lift station engine generator, automatic transfer switch, pump controls, and electrical components. Est. Value: $ 226,000.00. There will be no pre-Bid conference. ll Work is included in a single prime contract. Bidding Documents, including Drawings and Specifications, may be examined at the offices of Village of Hartland, and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. The Village of Hartland reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Please contact QuestCDN at 952-233-1632 or info@Questcdn.com for assistance in free membership registration, downloading, and working with this digital project information. QuestCDN is the Issuing Office. Partial sets of Bidding Documents are not available. Neither Owner, Engineer nor Issuing Office is responsible for full or partial sets of Bidding Documents, including any Addenda, obtained from other sources. The cost of Bidding Documents is non-refundable. Each entity obtaining Bidding Documents from the Issuing Office will be designated as a Plan Holder of Record. Bids received from entities who are not Plan Holders of Record may be returned as being nonresponsive. A Bidder's qualification statement must be delivered to the Village of Hartland at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to Village of Hartland equal to of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to Village of Hartland as liquidated damages.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents