Similar Projects
Flowserve Bare Pump
Term Contract
Bidding
San Antonio, TX

Contract for the Purchase of a Submersible Pump
Post-Bid
San Antonio, TX

Saws Water Well Mitigation Program
Post-Bid
Less than $95,000 est. value
San Antonio, TX 78212

Saws Water Well Mitigation Program
Results
Less than $97,000 est. value
San Antonio, TX

Water Wells Project Pleasanton ISD
Results
Pleasanton, TX 78064

Annual Contract for Wastewater Submersible Pump Unit Repair Services
Post-Bid
San Antonio, TX 78212

Annual Contract for Maintenance and Servicing of Deep Injection Well Valves and Heads
Results
San Antonio, TX 78212

2020 Well 5 Completion Construction
Post-Bid
Poth, TX 78147

Annual Contract for Hydromatic Parts and Service
Results
San Antonio, TX 78200

Elmendorf Water Supply Project
Post-Bid
Elmendorf, TX 78112

Annual Contract for TCEQ Injection Zone Report and Pressure Falloff Test/Data Analysis
Results
Less than $31,600 est. value
San Antonio, TX 78200

Annual Contract for Centrifugal Water Pump Preventative Maintenance and Repair Services
Term Contract
Post-Bid
San Antonio, TX

Micron Pump Station Well Pump No. 4 - Micron Well Fit Out P2
Results
Less than $1,800,000 est. value
San Antonio, TX 78251

H2oaks Desalination Facility, Well Field Collection Pipeline Project
Results
Less than $3,589,963 est. value
San Antonio, TX 78212

Water Well Mitigation Program
Results
Less than $100,000 est. value
San Antonio, TX 78212

Last Updated 05/05/2021 09:17 AM
Project Title

H2Oaks Carrizo Monitoring Wells Program

Physical Address View project details and contacts
City, State (County) (Atascosa, Bexar, Wilson Counties)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $480,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of three 6” Carrizo monitoring wells, all for the H2Oaks Center as part of Job No. 21-8610. The project area will include all or parts of the following counties: Bexar, Atascosa, Wilson. These additional monitoring wells will be located along the southern boundary of the H2Oaks property. The wells will be constructed with a slight delay in between wells, as the wells will need to be sampled and the samples analyzed. The analysis will help determine the location of the next well.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents