Similar Projects
Fire Services Administration Building
New Construction - 35,000 SF
Conception
$13,200,000 est. value
Pasadena, TX

Rebuild Station #7
New Construction
Conception
$5,740,000 est. value
Pasadena, TX 77504

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

City of Deer Park Police Department Emergency Operations Center (EOC)
New Construction
Design
Deer Park, TX 77536

New Cypress Creek Fire Station Number 25
New Construction - 9,000 SF
Post-Bid
Less than $7,000,000 est. value
TX

Eastex VFD Fire Stations Number 26 and Number 46 Renovations
Renovation
Post-Bid
Less than $3,750,000 est. value
TX

Construction of the Sheldon Community Fire and Rescue Fire Administration and Maintenance Facility
New Construction - 28,500 SF
Results
Less than $10,000,000 est. value
Houston, TX 77049

CMAR for the Public Safety Building
New Construction
Results
Less than $55,000,000 est. value
Baytown, TX 77521

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

New EMS Station 97
New Construction - 4,000 SF
Construction
Humble, TX 77346

HCFMO - Training Facility Atascocita
New Construction
Pending Verification
Houston, TX

Rebuild Station #6
New Construction
Conception
$5,740,000 est. value
Seabrook, TX 77586

Ben Bradley Police Building Renovation & Addition
Renovation, Addition
Design
Houston, TX

New Fire Station 1
New Construction - 19,896 SF
Post-Bid
Less than $6,500,000 est. value
Houston, TX 77040

The Renovation and Addition to Klein Fire Station Number 6
Renovation, Addition - 9,500 SF
Results
$3,000,000 to $3,500,000 est. value
Tomball, TX 77377

Last Updated 01/28/2022 07:48 AM
Project Title

Rosehill Fire Station 3

Physical Address View project details and contacts
City, State (County) Hockley, TX 77447   (Harris County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: the new construction of an 15,310 square foot fire station. Site work to include earthwork, paving, sidewalks, parking, site utilities, storm drainage, detention pond, septic system, on-site water well, and landscaping. Building construction to include stiffened slab on grade, structural steel framing, wood framing, CMU framing, natural stone, brick masonry & fiber cement siding, and CMU interior partitions, standing seam metal roof, storefront windows & entry doors, hollow metal & wood doors, hardware, acoustical tile & gypsum board ceilings, flooring, painting, millwork, fire suppression, mechanical systems, plumbing systems, and electrical systems.

Details

Fire/Police Station, 15,310 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents