Similar Projects
Orchards at Howard Gap
New Construction, Infrastructure
Conception
$9,000,000 CJ est. value
Hendersonville, NC 28792

Cedars Lodge and Spa
Demolition, New Construction, Infrastructure
Design
$60,091,960 CJ est. value
Hendersonville, NC 28791

Cedars Lodge and Spa
Demolition, New Construction, Infrastructure
Design
$60,091,960 CJ est. value
Hendersonville, NC 28791

New Bulk Salt Storage Building
New Construction, Infrastructure - 3,200 SF
Bidding
$500,000 CJ est. value
Hendersonville, NC 28791

Spearman Paving Repairs
Infrastructure
Bidding
$300,000 CJ est. value
Flat Rock, NC 28731

Elementary School Playground Improvements Package A
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Flat Rock, NC 28731

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

East Campus Drive Paving Repairs
Results
NC 28731

Garrison Lane Site Improvements - Project Wheel
Infrastructure
Results
$575,285 est. value
Hendersonville, NC

Ingles #140 / Fletcher
New Construction, Infrastructure - 88,988 SF
Pending Verification
$23,000,000 CJ est. value
Fletcher, NC 28732

Legacy Place Industrial/Manufacturing Flex Space
New Construction, Infrastructure
Pending Verification
$13,500,000 CJ est. value
Fletcher, NC 28732

The Stillwell
New Construction, Infrastructure - 65,000 SF
Design
$18,500,000 CJ est. value
Hendersonville, NC 28792

Shoulder Reconstruction, Mill, Pave, Traffic Control Along Various Secondary Routes
Infrastructure
Bidding
$3,000,000 CJ est. value
Hendersonville, NC 28792

Army Reserve Center
New Construction, Infrastructure - 31,637 SF
Post-Bid
$25,000,000 CJ est. value
East Flat Rock, NC 28726

Last Updated 04/03/2023 04:10 AM
Project Title

Drainage Improvements - Town of Laurel Park

Physical Address View project details and contacts
City, State (County) Laurel Park, NC 28739   (Henderson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $79,025 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 35 culvert replacements entailing pavement removal, full depth patching, installation of precast catch basins and headwalls, providing rip rap and filter fabric.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents