Similar Projects
Ontario Place
New Construction, Infrastructure - 33,600 SF
Conception
$5,800,000 CJ est. value
Olympia, WA 98501

Forest Park 2
New Construction, Infrastructure
Conception
$22,600,000 CJ est. value
Tumwater, WA 98512

New Police Station - City of Lacey
Demolition, New Construction, Infrastructure
Design
$38,000,000 CJ est. value
Lacey, WA 98503

SR 507/N of Connor Rd - Culvert Replacement
Infrastructure
Design
$123,000 CJ est. value
Rainier, WA 98576

On-Call Street Sweeping Waste and Vactor Waste Transport and Disposal Services
Term Contract
Post-Bid
Olympia, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SouthWest Mosman Avenue Phase Two
Infrastructure
Results
$1,150,000 to $1,270,000 est. value
Yelm, WA 98597

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

FSCSS Olympia Affordable Apartment Phase 2
New Construction, Infrastructure
Construction
$25,000,000 CJ est. value
Olympia, WA 98502

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

Pilot Travel Center / Tumwater
Addition, Infrastructure, Build-out - 1,100 SF
Pending Verification
$400,000 CJ est. value
Tumwater, WA 98512

US 101/Black Lake Blvd Bridge - Special Repair
Infrastructure, Renovation
Conception
$316,000 CJ est. value
Tenino, WA 98589

New Office Building M&T Advanced Properties
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Olympia, WA 98501

Chief Joseph Wildlife Area Road Stabilization Phase 2
Infrastructure
Post-Bid
Olympia, WA

Last Updated 03/31/2023 05:06 PM
Project Title

Golf Club Road Water and Wastewater Improvements

Physical Address View project details and contacts
City, State (County) Lacey, WA 98503   (Thurston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $6,562,091 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the installation of approximately 4,700 LF of 6-inch, 8-inch and 12-inch diameter water main, 4,500 LF of 8-inch, and18-inch diameter gravity wastewater main and 1,800 LF of 10-inch diameter pressure wastewater main located on Golf Club Road SE and Lacey Blvd SE between 26th Ave SE and Sleater-Kinney Road SE, including night work within the roundabout and the intersection of Lacey Blvd SE and Sleater-Kinney Rd SE as required. Work to include temporary traffic control, construction of service lines, meters, valves, transfer of water and sewer services, connections to existing water and wastewater systems, water and wastewater main abandonments, asphalt and concrete pavement, lawn restoration and other work. Each bid must be accompanied by a certified check for five percent of the amount of the proposal made payable to the City Treasurer, or an approved bid bond for five percent of the amount of the proposal executed on the approved form attached to these specifications. If bid bond is used, the five percent may be shown in dollars and cents or the form may be filled in by inserting therein, in lieu thereof, five percent of the amount of the accompanying proposal. Check of unsuccessful bidders will be returned immediately upon award of contract. The City Council reserves the right to reject any and all bids and to waive all informalities. Any questions regarding this contract can be directed to: Jason Kashani jkashani@ci.lacey.wa.us The range for this project is $6,500,000 to $8,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents