Project Title | 5th Avenue Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | West Bend, WI (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Significant types of work and approximate quantities include: Furnish and Install Sanitary Sewer Main 1,500 LF Furnish and Install Sanitary Sewer Manhole 7 EA Furnish and Install Water Main 1,500 LF Furnish and Install Hydrant Assembly 4 EA Furnish and Install Storm Sewer Main and Lead 3,000 LF Furnish and Install Storm Sewer Manhole 17 EA Furnish and Install Storm Sewer Catch Basin 2 EA Furnish and Place Concrete Curb and Gutter 3,200 LF Furnish and Place Base Aggregate Dense 2,700 CY Furnish and Place Breaker Run, Incl. Overexcavation 600 CY Remove and Replace Concrete Sidewalk, 4-Inch 6,100 SF Remove and Replace Concrete Sidewalk, 8-Inch 1,300 SF Remove and Replace Concrete Driveway, 8-Inch 4,200 SF Furnish and Place Asphalt Pavement, 5-Inch 1,850 TN Furnish and Place Topsoil, Seed, Fertilizer, Mulch and Water 2,500 SY |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |