Similar Projects
Urban Grading, Curb and Gutter, Storm Sewer, Lighting, PCC Surfacing, Sidewalk, Curb Ramps - US 16
Infrastructure
Conception
$21,362,000 CJ est. value
Custer, SD 57730

Urban Grading, Curb and Gutter, Storm Sewer, Lighting, PCC Surfacing, Sidewalk, Curb Ramps - US 16
Infrastructure
Conception
$21,362,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

Replace Str (RCBC), Approach Grading
Infrastructure
Design
$1,852,000 CJ est. value
Custer, SD 57730

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Construction of a Trailer Dump Station
New Construction, Infrastructure
Bidding
$231,944 CJ est. value
Custer, SD 57730

Repair NPS Route 5 for Wind Cave NP
Alteration
Post-Bid
Hot Springs, SD 57747

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bridge Deck Polymer Chip Seal Repair
New Construction, Infrastructure
Results

Rout and Seal
Infrastructure
Bidding
$400,000 CJ est. value
State Game Lodge, SD 57730

Intersection Improvements
Infrastructure
Post-Bid
SD

Structure Demolition and Site Restoration
Demolition, Infrastructure
Results
Custer, SD 57730

Sylvan Lake Store Replacement
Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Custer, SD 57730

Shared Use Path
Infrastructure
Results
SD

Last Updated 02/20/2023 03:34 AM
Project Title

Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration

Physical Address View project details and contacts
City, State (County) Custer, SD 57730   (Custer County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $5,356,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

US16A - Fm 2 E of Custer to SD36 Length 12.8 As of February 20, 2023, the project is in Conceptual status. Anticipated Construction year is 2024. SDDOT - Mill, AC Resurfacing, Pipe Work, Modify Intersection, Bridge Rail Upgrade, Inslope Restoration *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents