Similar Projects
Concrete Improvements - W. 32nd Street
Infrastructure
Bidding
$400,000 CJ est. value
Pueblo, CO 81008

Fuel Site - The Ranch
Renovation
Bidding
$199,000 CJ est. value
Loveland, CO 80538

Joint and Crack Sealing
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Fairplay, CO 80440

Pre-Overlay Concrete 2C/PPRTA
Term Contract
Sub-Bidding
$200,000 CJ est. value
Colorado Springs, CO 80903

Construct Vehicle Storage for High-Altitude Army Aviation Training Site (HAATS)
New Construction, Infrastructure - 6,191 SF
Post-Bid
$1,700,000 CJ est. value
Gypsum, CO 81637

Precast Primary Junction Vaults
Term Contract
Post-Bid
Fort Collins, CO 80521

NCCWTP Concrete Repairs
Results
$100,000 to $130,000 est. value
Denver, CO

2022 Concrete Replacement Project
Infrastructure
Results
$160,585 est. value
Louisville, CO

2023 Paving Program
Infrastructure
Construction
$760,000 CJ est. value
Firestone, CO 80520

Request For Qualifications - Open Space & Mountain Parks Shale and Eagle Trail Construction City of Boulder
Infrastructure
Bidding
$200,000 CJ est. value
Boulder, CO 80302

Asphalt Pulverizing - Speedway Blvd
Infrastructure
Sub-Bidding
$351,000 CJ est. value
Dacono, CO 80514

2022 Chip Seal Program
Infrastructure
Post-Bid
$200,000 CJ est. value
Firestone, CO 80520

Campus-Wide Concrete Removal and Replacement
Alteration
Results
Durango, CO 81301

Concrete Replacement 2022
Alteration
Post-Bid
$400,000 est. value
Winter Park, CO

Paul Derda Recreation Center Outdoor Concrete Replacement
Renovation, Infrastructure, Alteration
Results
$100,000 est. value
Broomfield, CO 80020

Last Updated 09/30/2023 01:31 PM
Project Title

Region 1 - Bottleneck Mitigation at SH83 and SH88

Physical Address View project details and contacts
City, State (County) Aurora, CO 80014   (Arapahoe County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,094,668 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in Region 1 in Arapahoe County. Project work consists of bottleneck mitigation at the interchange if SH83 And SH88 primarily consisting of modifications to the eastbound outside curb line, and changes to the signing and striping. Work will also include minor signal modifications. Please contact Tony Brindisi at 303-512-4331 for all project related questions. Region: 1 Counties: Arapahoe It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 Contract UDBE Goal: 0.00 % Work Days: 40 CODOT - 002 - Region 1 - Bottleneck Mitigation at SH83 and SH88 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents