Similar Projects
Wilson Park Creek Reach 3 Phase 1 - Detention Basin
Infrastructure
Bidding
Milwaukee, WI

Streetscape Materials
Post-Bid
Milwaukee, WI 53202

Cold Water Fire Service Meters
Term Contract
Post-Bid
Milwaukee, WI 53202

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Habitat for Humanity ReStore
Addition, Infrastructure - 27,078 SF
Pending Verification
Wauwatosa, WI 53222

Fresh Coast Green Schoolyards Program: MMSD GI Service Area
Renovation
Post-Bid
Milwaukee, WI 53204

Paving Work
New Construction
Results
Milwaukee, WI 53202

On-Call Construction Services for Sewer Repair and Rehabilitation
Term Contract
Post-Bid
Milwaukee, WI

Bioswale
New Construction
Results
Milwaukee, WI

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Parking Lot
Results
Milwaukee, WI 53205

M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Paving
Results
Milwaukee, WI 53202

Combined Sewer Overflow (CSO) 195 Relocation
Renovation
Post-Bid
Milwaukee, WI

Last Updated 09/28/2021 06:08 PM
Project Title

68th Street Improvement

Physical Address View project details and contacts
City, State (County) Wauwatosa, WI   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Storm sewer construction,water main construction, sanitary and storm sewer lining and lateral grouting,asphalt repaving and reconstruction including grading, concrete curb and gutter replacement, asphalt pavement, concrete pavement, pavement markings,and work

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents