Similar Projects
Sheet Metal Contracting Parking Lot Improvements
Renovation
Conception
Bear, DE 19701

Newark Charter School Site Improvements
New Construction
Conception
Newark, DE 19711

E A Delle Donne Corporate Center - Building II Addition with Parking Garage
Addition - 111,971 SF
Design
Wilmington, DE 19805

Camoirano Property Subdivision
New Construction
Design
Hockessin, DE 19707

Southern New Castle County Library - Sitework
Bidding
Middletown, DE 19709

Direct Push Drilling Services
Post-Bid
New Castle, DE

Brandywine High School Renovations Phase 2 - Site Work
Post-Bid
Wilmington, DE

Rodney Square Revitalization - Site Work
Results
Wilmington, DE

William Hicks Anderson Community Center (WHACC) - Renovation - Site Work and Concrete
Results
Wilmington, DE 19801

Chemours Headquarters
Renovation - 532,000 SF
Construction
$7,900,000 est. value
Wilmington, DE 19899

Chemours Headquarters
Renovation - 532,000 SF
Construction
$7,900,000 est. value
Wilmington, DE 19899

North Wilmington Self Storage
New Construction - 128,560 SF
Conception
$10,000,000 CJ est. value
Wilmington, DE 19802

DuPont Kalrez Manufacturing Phases I & II
New Construction, Addition - 102,910 SF
Design
$45,000,000 est. value
Newark, DE 19711

Newark Lean Academy Learning Center
Renovation
Post-Bid
Newark, DE 19702

Rodney Complex - Mass Excavation
Results
Newark, DE 19711

Reported 02/28/2019 10:33 AM
Project Title

First State Crossing

Physical Address View project details and contacts
City, State (County) Claymont, DE 19703   (New Castle County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Office, Site Development
Contracting Method Bids by Invitation.
Project Status Master Planning
Bids Due View project details and contacts
Estimated Value $100,000,000 to $200,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The plan is divided into four sections: the First State Corporate Center, First State Employment Center, First State Transit Center and the First State Logistics Center, will be done in 2 phases
Details 4 Office, Manufacturing/Processing Plant, Site Development, Approximately 600,000 SF New Construction, 425 Acres.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents