Similar Projects
Blue Oval City Industrial Park
New Construction
Conception
$5,600,000,000 est. value
Stanton, TN 38069

Pinewood Townhomes
New Construction, Infrastructure
Conception
$66,000,000 CJ est. value
Chattanooga, TN 37421

Ariens Company New Manufacturing And Warehouse Facility
Renovation
Conception
$38,000,000 est. value
Fayetteville, TN

Staybridge Suites / Sevierville
New Construction, Infrastructure
Conception
$24,200,000 CJ est. value
Sevierville, TN 37862

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

VK Integrated Systems Manufacturing Facility
New Construction
Conception
$840,000 est. value
Clarksville, TN 37040

Hardin Valley Academy 32 Classroom Addition - Knox County
Addition, Demolition, Infrastructure
Conception
$10,972,000 CJ est. value
Knoxville, TN 37932

Northwest Elementary School Construction - Knox County
New Construction, Infrastructure
Conception
$8,950,000 CJ est. value
Knoxville, TN 37902

Germantown/Eastbank Pedestrian Bridge - 19DS0129 - Metropolitan Government of Nashville & Davidson County
Infrastructure
Conception
$22,139,044 CJ est. value
Nashville, TN 37219

Alton Park Connector - City of Chattanooga
Infrastructure
Conception
$5,500,000 CJ est. value
Chattanooga, TN 37402

Midtown Pathway - City of Chattanooga
Infrastructure
Conception
$3,000,000 CJ est. value
Chattanooga, TN 37411

Station 15 Replacement(Addition) - City of Chattanooga
Demolition, New Construction, Infrastructure
Conception
$1,500,000 CJ est. value
Chattanooga, TN 37402

Dartmouth/Five Points Watershed SIP - Phase I - City of Chattanooga
Infrastructure
Conception
$6,993,600 CJ est. value
Chattanooga, TN 37402

Carter-Lee Park - Town of Smyrna
Infrastructure
Conception
$600,000 CJ est. value
Smyrna, TN 37167

Bella Collina Subdivision
New Construction, Infrastructure
Conception
$3,000,000 CJ est. value
Brentwood, TN 37027

Last Updated 03/29/2023 04:13 PM
Project Title

Duksan Electera

Physical Address View project details and contacts
City, State (County) Shelbyville, TN 37160   (Bedford County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $95,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of project is new construction of a 220,000 square foot industrial facility. As of March 29, 2023, the project is in design. Information regarding the general contractor has not been disclosed. No construction timeline has been established at this time.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

220,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents