Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Marantha Christian Academy
Build-Out - 28,000 SF
Conception
Mattoon, IL 61938

Grade School Renovations
Renovation, Addition - 7,000 SF
Design
$3,500,000 est. value
Orion, IL 61273

CPS Sor Juana ES Relocation to Hancock College Prep ICR
Renovation
Bidding
$750,000 est. value
Chicago, IL 60629

American Dreamer Stem Academy New Gymnasium And Renovations
New Construction, Renovation, Addition - 76,893 SF
Bidding
Decatur, IL 62521

Kanoon 2021-29071-ROF / Polaris 2021-67081-ROF
Post-Bid
Less than $8,700,000 est. value
Chicago, IL 60623

ROF Norwood Park
Renovation
Post-Bid
Less than $4,000,000 est. value
Chicago, IL 60631

Emerson Elementary School Renovations
Renovation
Results
Less than $3,400,000 est. value
Elmhurst, IL 60126

South School HVAC Upgrades - Bid Package #1
Results
Glencoe, IL 60022

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Washington Elementary School Facility Expansion
Addition
Conception
Park Ridge, IL 60068

Gray ES Gymatorium Renovation
Renovation
Bidding
$500,000 est. value
Chicago, IL 60641

Hibbard Elementary School Pool
Renovation
Post-Bid
Chicago, IL 60625

2021 Summer Renovations - Bid Release 2
Renovation
Results
Sleepy Hollow, IL 60118

Irving-SGN
Renovation
Bidding
Chicago, IL 60612

Last Updated 04/12/2022 04:15 PM
Project Title

2022 Renovations

Physical Address View project details and contacts
City, State (County) Effingham, IL 62401   (Effingham County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of roof replacement, window replacements, exterior door replacements, interior renovations, HVAC replacement, and electrical work including all associated work at South Side Elementary School.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents