Similar Projects
Last Updated | 04/26/2023 05:36 AM |
Project Title | Holly Drive and Redwood Road Drainage Improvements |
Physical Address | View project details and contacts |
City, State (County) | Boiling Spring Lakes, NC 28461 (Brunswick County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | GENERAL SCOPE OF WORK: The City of Boiling Spring Lakes proposes stormwater drainage improvements along Holly Drive and Redwood Road. The work generally includes but is not limited to installation of reinforced concrete pipe storm sewer ranging in size from 18-inch diameter to 42-inch diameter along with concrete inlets and manholes. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda delivered by either mail or approved electronic means to all parties recorded by the Engineer as having received the Bidding Documents. Questions received less than five (5) days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Contractor waives the right to rely on information provided by the Engineer which is not provided in writing and in the form of a formal Addendum. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |