Last Updated | 03/31/2023 06:31 AM |
Project Title | Highway 60-125 Force Main Adjustment |
Physical Address | View project details and contacts |
City, State (County) | Rogersville, MO 65742 (Webster County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $650,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Category Code: Fittings and Valves, Sewer and Water Construction, Sewer Force Main, Water/Wastewater Infrastructure, Construction, Utility Street Construction and Excavation Description: The Work to be performed under the Base Bid provisions of this contract consists of construction of approximately 131 linear feet of 1.5" pressure sewer (force main), approximately 2,091 linear feet of 6" pressure sewer (force main), approximately 2,664 linear feet of 8" pressure sewer (force main), approximately 125 linear feet of 1.5" pressure sewer installed in 3" DR11 continuous HDPE casing, approximately 103 linear feet of 6" pressure sewer installed in 14" steel casing, approximately 103 linear feet of 8" pressure sewer installed in 18" steel casing, salvaging of existing 6" and 8" air release valves along with all necessary appurtenances. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |