Similar Projects
Walmart Supercenter #2084-249 - Entertainment Optimization
Renovation - 20,568 SF
Design
Bozeman, MT 59715

Walmart Supercenter #1956-252 - Entertainment Optimization
Renovation - 204,736 SF
Design
Billings, MT 59102

Walmart Supercenter #3259-247 - CSP
Renovation - 207,693 SF
Bidding
Missoula, MT 59808

Walmart Supercenter #1872-605 - CAPXHVAC-1
Renovation
Post-Bid
Helena, MT 59601

Target #1282- Grocery Pick-UP
Renovation - 500 SF
Post-Bid
Helena, MT 59602

Walmart Supercenter #2147-240- OGP-GB
Renovation - 850 SF
Construction
$462,018 est. value
Missoula, MT 59804

Walmart Supercenter #3259-241 - RM-1
Renovation - 20,769 SF
Construction
Missoula, MT 59808

Walmart Supercenter #1872-241 - Entertainment Optimization
Renovation - 19,721 SF
Design
Helena, MT 59601

Walmart Supercenter #2455-604 - Capxref-1
Renovation
Post-Bid
Great Falls, MT 59404

Walmart Supercenter #7199-216 - OGP-CE
Renovation - 850 SF
Construction
$9,073 est. value
Great Falls, MT 59405

Walmart Supercenter #1901-238 - Entertainment Optimization
Renovation - 21,637 SF
Design
Butte, MT 59701

Target Cafe #1333 Grocery Pickup
Renovation
Post-Bid
Billings, MT 59105

Sam's Club #4805-217 - RM
Renovation - 136,114 SF
Construction
Billings, MT 59101

Walmart Supercenter #2259-234 - ENTERTAINMENT OPTIMIZATION
Renovation - 188,028 SF
Design
Kalispell, MT 59901

Walmart 0-3--TENANTBID--2021 - Bundle #3
Renovation
Post-Bid

Last Updated 08/25/2021 12:06 PM
Project Title

Murdoch's Ranch & Home Supply

Physical Address View project details and contacts
City, State (County) Anaconda, MT 59711   (Deer Lodge County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation.
Project Status Design Development, Construction Start Expected second quarter 2022, Construction Completion Expected fourth quarter 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project entails construction of a 46,000 square-foot store near the corner of Highway 1 and Fillmore Street, just across from Town Pump and just east of the new Forge Hotel.

Details

Retail, 46,000 SF New Construction, Building.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents