Similar Projects
West Access Road and Waterline Improvements
Bidding
Eagle Mountain, UT 84005

Lindon City Culinary Waterline Replacement Project - Geneva Road
Post-Bid
Lindon, UT

Z--Pao Domestic Water Heater System Replacement
Post-Bid
$25,000 to $100,000 est. value
Provo, UT

2018 PRV Vaults
Results
UT

Construction of the 2018 Culinary Waterline Replacement Project Phase 7
Results
American Fork, UT

Water Line Pipe and Fittings
Post-Bid
Provo, UT

Construction of the American Fork City - American Fork Canyon Water Line
Results
Less than $3,163,132 est. value
American Fork, UT

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

Foothill Waterline Project
Results
Less than $1,100,000 est. value
Mapleton, UT

2020 Geneva Park Parking Lot Project
Post-Bid
$375,000 to $445,000 est. value
Orem, UT 84057

Battle Creek Springs Rehabilitation
Results
Less than $2,180,410 est. value
Pleasant Grove, UT

Spanish Fork Jr High Transportation Corridor Phase 1
Post-Bid
Less than $1,600,000 est. value
Spanish Fork, UT 84660

State Street Water Line 470 West to 300 West
Results
Less than $425,190 est. value
American Fork, UT

Pressurized Irrigation Metering Project
Post-Bid
Lehi, UT 84043

Spring Creek Place Water Pipeline Replacement
Results
Springville, UT

Reported 05/11/2019 12:00 AM
Project Title

Sandpit Transmission Pipelines Project

Physical Address View project details and contacts
City, State (County) Lehi, UT   (Utah County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from Agency's Affiliate - 04/25/19
Owner View project details and contacts
Architect View project details and contacts
Description Install a new 30-inch secondary water transmission pipeline and a 20-inch culinary transmission pipeline from the Lehi Water & Sewer building to 1200 West and potentially another small piece on frontage road, through residential and commercial areas including a UTA tracks crossing. The preferred pipe materials are ductile iron for the 30-inch secondary pipe and the 20-inch culinary waterline. The construction includes valves, fire hydrants, street restoration and may include a boring under UTA Tracks, which is to be completed by November of 2019.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents