Similar Projects
Ingersoll Rand Compressed Air System Purchase and Install
Bidding

Ingersoll Rand Compressed Air System Purchase and Install
Bidding

Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

Brigham City 10, 16 Wards Hvac
Renovation
Post-Bid
Brigham City, UT

Weatherization Program
Results
Price, UT

Installation of Roof Top Unit for ARl Middle School
Results
Blanding, UT

DFCM Construction - Price Armory Boiler, Pump, Controls Replacement
Bidding
$460,783 est. value
Price, UT 84501

HVAC Maintenance Services
Post-Bid
Salt Lake City, UT 84119

DFCM Construction-Pre Qualified Mechanical-DOC/CUCF Mechanical Room New Chiller/Cooling Tower
Results
Less than $1,000,000 est. value
Gunnison, UT 84634

DFCM Construction - Pre Qualified Mechanical - DOH USL Mod 1 RCX/HVAC Repairs
Bidding
$175,000 est. value
West Valley City, UT 84119

Wall Mounted HVAC for Portable Classrooms
Term Contract
Post-Bid
Salt Lake City, UT 84070

HVAC
Results
Logan, UT 84322

SD 100 HVAC Inverter Replacement
Bidding
Salt Lake City, UT

York OEM HVAC Parts and Equipment
Term Contract
Post-Bid
Salt Lake City, UT 84190

Airmed Hanger Modifications - Evaporator Cooler and Electrical
Results
Less than $97,000 est. value
Salt Lake City, UT 84112

Reported 03/31/2021 12:00 AM
Project Title

Removal of 18 Existing Electric Furnaces and Air Conditioning Units and Installation of 18 New HVAC Gas Units

Physical Address View project details and contacts
City, State (County) Beaver, UT   (Beaver County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of 18 existing electric furnaces and air condition units and installation of 18 new HVAC gas units. The existing units are all in one building servicing 18 small one bedroom apartments located at 40 north 300 east, Beaver Utah. Also included is the installation of gas lines to the building or tying into the existing line currently on site, and installation of the gas lines to each new HVAC unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents