Similar Projects
Replace Red Listed Bridge Carrying NH 28 Over Suncook River
New Construction
Bidding
$2,867,374 est. value
Allenstown, Pembroke, NH

Nature Trail Construction
Post-Bid
Claremont, NH 03743

Rehabilitation of Barn Door Gap Road Bridge over Big River (NHDOT Bridge No. 057/137)
Post-Bid
Strafford, NH

State Aid Highway Project NH Route 3A & Dunklee Road Intersection Improvement & State Aid Bridge Project Dunklee Road Bridge Rehabilitation Over Bow Bog Brook
Results
$1,800,000 to $2,100,000 est. value
Bow, NH

Bunker Hill Road Bridge Replacement over Mill Brook
Results
$500,000 to $550,000 est. value
Tamworth, NH

Lift Bridge PLC Services
Term Contract
Post-Bid
Concord, NH 03302

Queen City Bridge Rehabilitation
Results
Manchester, NH

Electrical Inspection, Maintenance and Repair for Bridges
Post-Bid
Concord, NH 03302

Snow Road Bridge 165/112 over South River
Results
Less than $275,000 est. value
Effingham, NH 03882

Expanding Polymer Injection
Post-Bid
Sanbornton, NH 03269

Goffs Falls Road Bridge Replacement
Results
Manchester, NH

Dougherty Lane Bridge Repair over the Middle Branch Piscataquog River
Post-Bid
New Boston, NH

Bridge Repairs - Market Street, Kearsarge Way Bridge Repairs
Results
$1,400,000 to $1,600,000 est. value
Portsmouth, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Canal Street Bridge Repairs - Bridge No 139/115
Results
Nashua, NH 03061

Reported 07/17/2021 12:00 AM
Project Title

Adaptive Reuse of Danbury Bridge

Physical Address View project details and contacts
City, State (County) Danbury, NH   (Merrimack County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Bridge Is Approximately 117’ Long And Has An Overall Width Of 25’- 4”. Span 1 Is Approximately 29’-7”, Span 2 Is 52’-1”, And Span 3 Is Approximately 35’-0”. The Girders Are Chorded With Skews Varying From 43 Degrees To 35 Degrees. Each Span Consists Of Seven Girders. The Girders In Span 1 And 3 Measure 2’-0” Deep And The Girders In Span 2 Measure 2’-9” With 4’-0” Between The Girders In All Spans. The Bridge Is Supported By h-Pile Piers With a Reinforced Concrete Base And Abutments.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents