Similar Projects
Last Updated | 09/14/2022 04:34 PM |
Project Title | Pool #1 Pit and Heater Building Replacement |
Physical Address | View project details and contacts |
City, State (County) | Sebastian, FL 32976 (Brevard County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $109,100 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Barefoot Bay Recreation District is seeking responses to a Request for Proposal for RFP No. 2022-05, Pool #1 Pit and Heater Building Replacement Project. Bidding for RFP No. 2022- 05 will open on August 23, 2022. The RFP can also be located at website. This required pre-submittal meeting will allow the proposer the opportunity to inspect the work sites and bring forward any questions concerning this RFP. Matt Goetz, Property Services Manager, will be available to answer any questions about the site. Any requests for additional information or clarification must be sent in writing to Stephanie Brown, District Clerk at sbrown@bbrd.org no later than September 16, 2022. All responses will be posted on the Bids page located on website. POOL #1- BBRD is seeking contractors for the complete design and replacement of the Pool pit, equipment and heater room removal at 625 Barefoot Blvd. Pool #1 which will include but is not limited to the following items: o Complete redesign of the Pool #1 pit and heater room, moving equipment off of the pool deck and outside the gates in BBRD's desired location o Draining of the pool to an adequate level to perform the work, removal of chemical pumps, main circulation pump, vacuum pump and heater to be returned to BBRD; all electrical systems to be removed o Removal and disposal of the electrical panel and plumbing inside the pit. Pump and other equipment will be returned to BBRD. o The current Pool pit is in very poor condition and is expected to be demolished completely as well as the current heater storage building (these are concrete structures and BBRD will not be responsible for disposal) the old pit will be filled and capped with concrete and pavers to match existing. The heater room area will also be capped with concrete. o A new structure and equipment is to be installed in BBRD's desired location. This may include relocation of the main drain plumbing as well as the water lines, drains, jets and gas line. Excavation of the new site and construction of the new pit to include but not limited to termination of the plumbing, electrical and gas services. o Reconnection of the existing heater within the new building. o Refilling of the pool, equipment testing and equipment training for the staff are required. Deadline for Written Questions Sept 16, 2022, 4:30pm |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |