Similar Projects
CEC Tower Install
Post-Bid
VA

Repair Building Envelope and Interior Infrastructure Control Tower at Facility 381
Renovation
Post-Bid
Hampton, VA 23665

USMS TOD Tower Upgrade
Results
Arlington, VA

DG11--IN615 Iridium Antenna Installation (VA-21-00065383)
Alteration
Post-Bid
Richmond, VA

Radio Communication Tower Services
Term Contract
Results
VA

Inspection and Maintenance of Radio Communications Towers
Term Contract
Results
Suffolk, VA

Roof Replacement and Miscellaneous Catwalk Repairs for Air Traffic Control Tower
Renovation - 2,200 SF
Results
Manassas, VA 20110

Design/Build Pentagon Control Tower and Day Station - PHASE II
New Construction
Post-Bid
$10,000,000 to $25,000,000 est. value
Arlington, VA

Tower Inspections and Maintenance Services
Term Contract
Results
VA

190 Foot Tower for New River Valley Emergency Communications Regional Authority
Post-Bid
Blacksburg, VA 24060

X005 Wind Cone Removal and Install
Results
Less than $25,000 est. value
Quantico, VA 22134

Reported 11/16/2021 12:00 AM
Project Title

FAA Chiller Plant and Control System Modifications, Washington Air Route Traffic Control Center

Physical Address View project details and contacts
City, State (County) Warrenton, VA 20187   (Fauquier County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $6,000,000 to $8,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Federal Aviation Administration (FAA), New England Region, currently has a requirement for the replacement and upgrade of the chiller system and facility building automation system at the Washington Air Route Traffic Control Center (ARTCC) located at 3701 Macintosh Dr., Warrenton, VA. The work shall include, but is not limited to, the following: A. Installation of two temporary air cooled chillers. B. Removal and replacement of multiple chillers, cooling towers, chilled water pumps, condenser water pumps and HVAC control system. C. Construction of an access platform related to new cooling towers. D. Removal and installation of power panels, conduit, wire. E. Relocation of fire alarm system devices and fire sprinkler systems. F. Removal and replacement of lighting in the chiller room and cooling tower yard. G. Facility wide replacement of the Building Automation System including all control panels, controllers, some devices and workstations. H. In accordance with Executive Order 13693 the FAA must maximize the use of safe alternatives to ozone depleting substances, as approved by Environmental Protection Agency's (EPA) Significant New Alternatives Policy (SNAP) Program. Chillers installed under this SIR must meet the requirement of the SNAP Program.

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Chillers and Coolers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents