Similar Projects
Lincoln Trail - 325049 - City of Cedar Rapids
Infrastructure
Conception
$1,957,000 CJ est. value
Cedar Rapids, IA 52401

Downtown Lot Improvements - City of Cedar Falls
Infrastructure
Conception
$300,000 CJ est. value
Cedar Falls, IA 50613

Seerley Park Renovation - 150 - City of Cedar Falls
Infrastructure
Design
$300,000 CJ est. value
Cedar Falls, IA 50613

Cedar River Safety and Recreational River lmprovements Phase I - City of Cedar Falls
Infrastructure
Design
$4,831,000 est. value
Cedar Falls, IA

Bituminous Seal Coat Program 2023
Infrastructure
Bidding
$242,000 CJ est. value
Waverly, IA 50677

Storm Lake Early Elementary School - Phase II
Addition, Demolition, Infrastructure - 30,000 SF
Bidding
$7,000,000 CJ est. value
Storm Lake, IA 50588

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Oak Park BLVD Sewer Replacement Project
Infrastructure, Renovation
Post-Bid
$545,000 CJ est. value
Cedar Falls, IA 50613

Grading - U.S. 30
Infrastructure
Results

2021 Water Supply Well
Infrastructure
Results
$185,000 est. value
Audubon, IA

City Park - City of Alta
Infrastructure, Renovation
Pending Verification
$475,600 CJ est. value
Alta, IA 51002

Gibson Property Development - Phase lll-V - City of Cedar Falls
New Construction, Infrastructure
Pending Verification
$1,400,000 CJ est. value
Cedar Falls, IA 50613

Gibson Property Development - Phase I - 2 - City of Cedar Falls
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Cedar Falls, IA 50613

Tiger Performance Center - Cedar Falls Community Schools
New Construction, Infrastructure - 85,500 SF
Design
$9,000,000 CJ est. value
Cedar Falls, IA 50613

Storm Lake Middle School Playground Contract
Infrastructure
Bidding
$400,000 CJ est. value
Storm Lake, IA 50588

Last Updated 03/04/2023 12:31 PM
Project Title

I-80 Utility Relocation

Physical Address View project details and contacts
City, State (County) West Branch, IA 52358   (Cedar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $747,982 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Upon receiving deposit check, plans and specifications will be mailed out. When plans and specifications are returned in good condition within 14 days of the award date of the project, deposit checks will be returned All proposals and bids in connection therewith shall be submitted to the City Clerk of said City on or before the time herein set for receiving bids. All proposals shall be made on official bidding blanks furnished by the City, and any alternations in the official form of proposal will entitle the Council, at its option, to reject the proposal involved from consideration. Each proposal shall be sealed and plainly identified. The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. All work shall be completed by June 30, 2023, subject to any extensions of time which may be granted by the City Council. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after the end of the contract period, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The City of West Branch reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the City. The work will include but is not limited to the following improvements: I-80 UTILITY RELOCATION Construct I-80 Utility Relocation including all labor, equipment, and materials necessary for installation of 10" water main in steel casing and 12" and 16" sanitary sewer force main in steel casing, and associated work including cleanup

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents