Similar Projects
Z--BF Sisk Safety of Dams (SOD) Modifications, Phase I
Renovation
Results
$100,000,000 to $500,000,000 est. value
Los Banos, CA

Big Dalton and San Dimas Dams Access Improvements Project
New Construction
Post-Bid
$6,750,000 to $10,250,000 est. value
Alhambra, CA

USACE SPK DBB Construction - Public Law (PL) 84-99 Levee Erosion Repair Site 1151-21
Renovation
Results
$5,000,000 to $10,000,000 est. value
Tracy, CA 95304

Bishop Tract Levee Maintenance Project
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Stockton, CA 95214

Folsom Dam Raise: LRWD and Main Dam Construction
New Construction
Post-Bid
$100,000,000 to $250,000,000 est. value
Folsom, CA

Replace Culverts
Infrastructure
Results
$2,180,000 est. value
Korbel, CA 95550

On-Call Maintenance and Inspection Services for San Gabriel Dam Hydroelectric Project
Term Contract
Bidding
$500,000 est. value
Azusa, CA 91702

Folsom Dam - HCR Fox HVOF Rods Replacement
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Folsom, CA 95630

River Diversion Structure Modernization
Renovation
Post-Bid
Sonoma, CA

Fairmount Park Weir Dam Repairs
Renovation
Results
Riverside, CA 92519

New River Improvement Project - Calexico Reach
New Construction, Renovation
Bidding
$28,000,000 to $30,000,000 est. value
Calexico, CA

Kansas and Marin Streets Wet Weather Conveyance Tunnel
New Construction
Results
$12,500,000 to $16,000,000 est. value
San Francisco, CA

Reported 06/15/2022 12:51 PM
Project Title

Systemwide Emergency Tunnel Ventilation Fan and Damper Replacement - Los Angeles County Metropolitan Transportation Authority (LA Metro)

Physical Address View project details and contacts
City, State (County) Los Angeles, CA   (Los Angeles County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $99,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Systemwide Emergency Tunnel Ventilation Fan and Damper Replacement** - Countywide Replace existing emergency fans and dampers with new energy saving fans and dampers to enhance safety. As of June 14, 2022, this project is currently in the planning stage. If this project becomes fully funded, it can be completed and in operation by 2028 for the Olympic Games. Information regarding a design team and a general contractor is not available. A firm construction start date has not been determined. *This project is included in the initial compilation of projects for consideration in Metro's Mobility Concept Plan in relation to the 2028 Olympics. This list has not been reviewed by the Games Mobility Executives. This project will continue to be updated as further information becomes available. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents