Similar Projects
Wilson Nursery Access Road Paving
Infrastructure
Bidding
$300,000 est. value
Boscobel, WI 53805

Chip Sealing, Asphalt, Wedging Bridge Sealant
Term Contract
Bidding
Beetown, WI

Seal Coat
Post-Bid
Glen Haven, WI

2021 Road Work
Post-Bid
Bagley, WI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Hickory Street and Gridley Avenue Reconstruction
Infrastructure
Bidding
Platteville, WI

Basswood Road Resurfacing
Post-Bid
Muscoda, WI

C. Platteville, Business 151, Staley Avenue to Commercial Drive
Results
Platteville, WI 53818

Seal Coating and Wedging
Infrastructure
Bidding
WI

Seal Coat
Post-Bid
Fennimore, WI

V. of Potosi, Brewery Hollow Road, Potosi Branch Bridge
Results
Potosi, WI 53820

2022 Water Main Replacement - CTH HHH
Infrastructure
Bidding
Kieler, WI

2021 Street and Utility Improvements
Post-Bid
Cuba City, WI

Lancaster - Platteville, Ush 61 To E. Jct. Old Lancaster Road
Results
Lancaster, Platteville, WI

Last Updated 02/25/2022 05:46 PM
Project Title

2022 Utility Improvements USH 61/STH 35

Physical Address View project details and contacts
City, State (County) Potosi, WI   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract consists of the following approximate quantities: • 6,8,10 and 12-inch PVC Water Main 5,300 lineal feet • 8-inch Directionally Drilled HDPE Water Main 114 lineal feet • 12 and 18-inch Storm Sewer 175 lineal feet • 30-inch Curb & Gutter 75 lineal feet • 4 and 6-inch Sidewalk and Driveways 5,000 square feet • Grass Restoration 7,500 square yards • Hot-Mix Asphalt Pavement Patching 135 tons • Coconut Erosion Mat 425 square yards

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents