Similar Projects
2022 Sidewalk Replacement Program
Infrastructure
Bidding
$160,000 est. value
Downers Grove, IL

2022 Concrete Patching Program
Infrastructure, Alteration
Bidding
$400,000 est. value
Elmhurst, IL 60126

Central Division - Asphalt Paving Maintenance
Post-Bid

General Road Maintenance Work
Post-Bid
Lakewood, IL

Crack and Joint Sealing of PCC Pavement
Results
Naperville, Plainfield, IL 60544

2020 Rebuild Illinois Bonds Program
Results
Less than $1,450,000 est. value
Darien, IL

2022 Row Accessibility Improvements
Infrastructure
Bidding
$400,000 est. value
Downers Grove, IL

2021 Asphalt Materials for Purchase and the Incidental Disposal of Asphalt Spoils
Post-Bid
Bloomingdale, IL

(3.157-Mile) Crack and Joint Sealing Project on IL 64 (North Avenue) from IL 53 (Rohlwing Road) to Villa Ave
Results
Addison, Lombard, Villa Park, IL 60101

Sealcoating Projects
Infrastructure
Bidding
$70,000 est. value
Bensenville, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

(2.80-Mile) Improvement on 1-290 from Grand Ave to Cook County Line Rd Consists of Cleaning and Sealing Cracks and Joints in the Existing Concrete Pavement
Results
Elmhurst, IL 60126

Hot-Mix Asphalt Surface
Post-Bid
Lisle, IL

Pavement Widening and Reconstruction, Sidewalks, Multi-Use Path, Storm Sewer, Traffic Signals
Results
Naperville, IL 60540

HMA Surface Removal
Post-Bid
Wood Dale, IL

Last Updated 06/02/2022 12:43 AM
Project Title

Van Buren Street & Crescent Avenue Reconstruction

Physical Address View project details and contacts
City, State (County) Elmhurst, IL 60126   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the reconstruction of approximately 2,450 ft on Crescent Avenue from Poplar Avenue East to Dead End, East of Edgewood Avenue and approximately 1,220 ft of Van Buren Street from Salt Creek (Dead End) East to Spring Road. The work shall also include removal and replacement of pavement and curbs; curb ramps; restoration of parkways; traffic control and other related work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents