Similar Projects
Kiwanis Park Improvements
Infrastructure
Design
$800,000 CJ est. value
Springfield, IL 62703

Kiwanis Park Improvements
Infrastructure
Design
$800,000 CJ est. value
Springfield, IL 62703

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

DNR Jim Edgar Panther Creek - Install Water Line To Gridley Road Residence
Results
Springfield, IL

FY2022 Seal Coat
Results
Springfield, IL

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

Lincoln Land Energy Center / Pawnee
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Pawnee, IL 62558

Resurfacing of Various Village Roads
Infrastructure
Post-Bid
IL

FY2022 Brick Street Repairs
Results
Springfield, IL

Navigator CO2 Ventures Midwest Carbon Capture Sequestration
Infrastructure
Pending Verification
$2,000,000,000 CJ est. value
Chatham, IL 62629

Existing Three-Span Structure Removal and Replacement
Infrastructure
Post-Bid
Springfield, IL

Fabyan Parkway/Orchard Road Highway Safety Improvement
Results
Springfield, IL 62702

Chicken Salad Chick / Springfield
New Construction, Infrastructure
Pending Verification
$400,000 CJ est. value
Springfield, IL 62703

Seal Coat
Infrastructure
Post-Bid
New Berlin, IL

Last Updated 10/06/2022 07:39 AM
Project Title

Lincoln Street Water Main Replacement (Contract D)

Physical Address View project details and contacts
City, State (County) Riverton, IL 62561   (Sangamon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,234,556 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: This project is for water main replacement consisting of approximately 4,890 linear feet of PVC C900 waterline, approximately 290 linear feet of SDR 11 HDPE butt fusion welded carrier pipe, installation of 12" and 14" steel casing for State Highway crossings, gate valves and valve boxes, ire hydrants, service reconnects and water main reconnects, additional appurtenances and site restoration of pavement surfaces. Bids are requested for the following Contract: Contract D - Lincoln Street Water Main Replacement (631-012.001/21007.03) The Project has an expected duration of 180 days. The Issuing Ofice for the Bidding Documents is: Kuhn & Trello Consulting Engineers, LLC 109 N. 7th Street, 3rd Floor Springield, IL 62701 Documents are also available for viewing at the below Plan Rooms. Southern Illinois Builders Association 1468 Green Mount Road O'Fallon, IL 62223 Phone: 618-624-9055 Email: dmr@siba-agc.org Website: , Greater Peoria Plan Room Greater Peoria Contractors & Supply Assoc. 1811 West Altorfer Peoria, IL 61615 Phone: 309-692-5710 Email: info@gpcsa.org Website, Central Illinois Plan Room 1620 South 5th Street Springield, IL 62703 Phone: 217-679-1077 Email: plans@ciplanroom.com Website: , Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Ofice on Monday through Friday between the hours of 8 a.m. to 4 p.m., and may obtain copies of the Bidding Documents from the Issuing Ofice as described below. Partial sets of Bidding Documents will not be available from the Issuing Ofice. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Ofice. All Contracts for the construction of public works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-2). Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and ittings, manhole covers and other municipal castings, hydrants, tanks, langes, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The De Minimis, minor components, pig iron and direct reduced iron waiver apply to this contract. Bid security shall be furnished in accordance with the Instructions to Bidders. The award of Contracts on this project shall be predicated upon competitive bidding, with award being made to the lowest responsive, responsible bidder. Said lowest Bidder(s) shall be determined for each Contract by summarizing the applicable low base bid(s). The owner reserves the right to waive any informalities or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Owner: Village of Riverton

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents