Similar Projects
Summerville Prepatory Academy
New Construction - 43,500 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Summerville, SC 29485

Irmo High School New East Wing
New Construction, Renovation
Conception
$44,000,000 est. value
Columbia, SC 29212

Conversion Of Fraser Elementary School To Early College High School
Renovation, Addition - 65,000 SF
Design
$29,400,000 est. value
Charleston, SC 29403

Districtwide Renovations - Lexington Four School District
Renovation
Bidding
Swansea, SC

New Dorchester 4 Middle School
New Construction
Bidding
Dorchester, SC 29437

Construction Management at Risk Services - Robert Smalls International Academy And Battery Creek High School
Post-Bid
Beaufort, SC 29906

Various Renovations to Five (5) Florence 1 Schools
Renovation
Post-Bid
Florence, SC 29506

General Contractor - CM at Risk - FY2020-2025 Projects
Results
Chesnee, SC 29323

Construction Management at Risk
Results
Forest Acres, SC 29206

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Georgetown Middle School Renovation
Renovation
Construction
Less than $6,500,000 est. value
Georgetown, SC 29440

New Middle School Construction
New Construction
Conception
SC

Chapin High School Stadium Renovations
Renovation
Bidding
Chapin, SC 29036

General Construction and Maintenance and Repair Services
Post-Bid
$2,000,000 est. value
Columbia, SC 29201

RHHS and NWHS Consumer Science Rooms Renovation
Renovation
Results
Rock Hill, SC 29732

Reported 12/16/2021 12:00 AM
Project Title

Integrated Project Delivery (IPD) Services for Conway High School Renovations

Physical Address View project details and contacts
City, State (County) Conway, SC 29526   (Horry County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes to provide Integrated Project Delivery services to the main building (243,000) includes replacement of the fire alarm system, replacement of the rooftop mechanical equipment and associated ductwork, hazardous material abatement, replacement of the roofing with a membrane roof system, replacement of the acoustical ceiling system, removal and reinstallation of low-voltage wiring, window replacement, installation of firestopping at rated assemblies, installation of decorative panels on exterior of building, replacement of damaged sidewalks, and installation of sod at certain locations. Since the facility will be occupied by staff and students during the school calendar year, the execution of the work during that time will be carefully coordinated with the ongoing functions and activities of the school.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents