Similar Projects
Murphy USA #7206/7851 / Glasgow
Demolition, New Construction, Infrastructure - 208 SF
Conception
$1,500,000 CJ est. value
Glasgow, KY 42141

Dever Golf Cart Sales and Service Center
New Construction, Infrastructure - 16,630 SF
Conception
$2,500,000 CJ est. value
Louisville, KY 40245

Asphalt Resurfacing - KY 100
Infrastructure
Design
$300,000 CJ est. value
Franklin, KY 42134

Orell Road Multi-Residential
New Construction, Infrastructure
Design
$90,500,000 CJ est. value
Louisville, KY 40272

Irrigation Improvement Project
Infrastructure
Bidding
$1,825,956 CJ est. value
Bowling Green, KY 42103

Irrigation Improvement Project
Infrastructure
Bidding
$1,825,956 CJ est. value
Bowling Green, KY 42103

Pipe and Fittings
Alteration
Post-Bid
Frankfort, KY

Howard's Mill Road Phase II Water Line Replacement
Infrastructure
Post-Bid
Mount Sterling, KY

Chiller and Water Replacement at Westport Middle School
Results
Louisville, KY 40222

Distribution System Site Development
Renovation
Results
Burgin, Harrodsburg, KY 40330

Water and Sewer Infrastructure
Infrastructure
Pending Verification
$2,336,513 est. value
Pikeville, KY

Beaumont Middle School - Fayette County Board of Education
Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Lexington, KY 40504

Safety Improvements on KY-80 from Leslie County Line to KY-451
Infrastructure
Conception
$5,400,000 CJ est. value
Hazard, KY 41701

Freys Hill Road New Apartments
New Construction, Infrastructure
Design
$120,000,000 CJ est. value
Louisville, KY 40241

West Hickman East Trunk Sewer Project
Infrastructure
Bidding
$9,800,000 CJ est. value
Lexington, KY 40509

Last Updated 10/11/2022 11:11 AM
Project Title

Duncan Boggs Drainage High Priority AML Project

Physical Address View project details and contacts
City, State (County) Whitesburg, KY 41858   (Letcher County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(Substantial Completion) + 90 Calendar Days (Final Completion) The proposed project, which will disturb approximately 0.5 acre within project boundaries encompassing approximately 0.7 acre, is for the purpose of restoring vehicular access to the Duncan Boggs residence. Reclamation actions to take place under this project include the replacement of a drainage culvert beneath the Boggs driveway (which is routed along the top of an abandoned sediment structure) that was washed away during the severe regional flooding that occurred at the end of July, 2022. A section of 48" diameter culvert will be placed with headwalls at either end, and the destroyed portion of the embankment will be rebuilt with ClassII stone. Resurfacing the gravel-paved access drive will complete the project. Remnants of the original sediment structure spillway, which are located at the bottom of the erosion trench through the embankment, will be removed prior to placement of the new drain structure. The project is not for the purpose or reconstructing a "dam", and the embankment will not retain any impoundment following this project. All disturbed areas within the project area will be revegetated using the standard AML Residential seed mixture appropriate to the season. Those areas maintained as residential lawn prior to the project will receive extra care to establish a smooth, even surface free of protruding stones that can readily be maintained as residential lawn after the project. The area to be disturbed by this project has previously been disturbed to a depth of several feet by a combination of coal mining, mining related construction, residential construction, and road construction. The proposed project will not cause any direct disturbance to any streams, and strict implementation and enforcement of standard AML sediment and erosion control Best Management Practices (BMPs) will prevent significant amounts of sediments disturbed by project-related actions from entering area streams to cause indirect impacts to area streams. The project will not disturb any caves or cave-like habitats, including underground mine openings or workings, and will not disturb any trees or forested habitats that are tenable as habitats for bats or other rare and endangered species. Millstone Missionary Baptist Church- 848 Highway 803 Millstone KY41838 Coordinates: 37 11'15.63"N 82 44'36.74"W No bidder may withdraw his bid for a period of thirty (30) days after the date set for the opening of bids. All bids shall be accompanied by a bid guarantee (in the form of a bid bond or certified check) of not less than five (5%) percent of the amount of the total bid. A 100% Performance Bond and a separate 100% Payment Bond shall be furnished by the successful bidder. All bonding and insurance requirements are contained in the Instructions to Bidders and/or General Conditions. Bonds should be executed by a surety company authorized to do business in the Commonwealth of Kentucky. The Division of Contracting & Administration, Commonwealth of Kentucky, reserves the right to reject any and all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents